New Jersey A 5636: Permits U.S. citizens who are full time college students to be district board members in county of college even if student is not a resident of county or State.
Status: Introduced in the Assembly, Referred to Assembly State and Local Government Committee (as of 2021-05-12)
State: New Jersey · Session: 219 · Bill: A 5636
Subjects: COUNTIES, HIGHER ED
Sponsors: Dunn, Aura K.
Bill Text
A5636 ASSEMBLY, No. 5636 STATE OF NEW JERSEY 222nd LEGISLATURE � INTRODUCED OCTOBER 15, 2026 Sponsored by: Assemblyman� ROBERT J. KARABINCHAK District 18 (Middlesex) SYNOPSIS ���� Modifies geographic restrictions for solar energy projects participating in community solar program. CURRENT VERSION OF TEXT ���� As introduced. �� An Act concerning geographic restrictions for community solar energy projects and amending P.L.2018, c.17. ���� Be It Enacted by the Senate and General Assembly of the State of New Jersey: ���� 1. Section 5 of P.L.2018, c.17 (C.48:3-87.11) is amended to read as follows: ���� 5. a. No later than 210 days after the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.), the Board of Public Utilities shall adopt, pursuant to the �Administrative Procedure Act,� P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations establishing a �Community Solar Energy Pilot Program� to permit customers of an electric public utility to participate in a solar energy project that is remotely located from their properties but is within their electric public utility service territory to allow for a credit to the customer's utility bill equal to the electricity generated that is attributed to the customer's participation in the solar energy project. ���� b.��� The rules and regulations developed by the board shall establish: ���� (1)�� a capacity limit for individual solar energy projects to a maximum of five megawatts per project; ���� (2)�� an annual capacity limit for all solar energy projects under the pilot program; ���� (3)�� geographic limitations for solar energy projects and participating customers; ���� (4)�� a minimum number of participating customers for each solar energy project; ���� (5)�� the value of the credit on each participating customer's bill; ���� (6)�� standards to limit the land use impact of a solar energy project as required in subsection r. of section 38 of P.L.1999, c.23 (C.48:3-87); ���� (7)�� the provision of access to solar energy projects for low and moderate income customers; ���� (8)�� standards to ensure the ability of residential and commercial customers to participate in solar energy projects, including residential customers in multifamily housing; ���� (9)�� standards for connection to the distribution system of an electric public utility; and ���� (10) provisions to minimize impacts to the distribution system of an electric public utility. ���� c.���� The board shall make available on its Internet website information on solar energy projects whose owners are seeking participants. ���� d.��� The board shall establish standards and an application process for owners of solar energy projects who wish to be included in the Community Solar Energy Pilot Program. The standards for the Community Solar Energy Pilot Program shall include, but need not be limited to, a verification process to ensure that the solar energy projects are producing an amount of energy that is greater than or equal to the amount of energy that is being credited to its participating customer's electric utility bills pursuant to subsection b. of this section, and consumer protection measures.� Projects approved by the board shall have at least two participating customers. ���� The board may restrict qualified solar energy projects to those located on brownfields, landfills, areas designated in need of redevelopment, in underserved communities, or on commercial rooftops. A solar facility located on a landfill, brownfield, contaminated site, or mining site may include associated lands, contiguous tracts of land, or related, non-contiguous tracts of land, which are developed as part of the same project.� The board shall not impose any limitations on the facility based on the proportion of associated, contiguous, or related lands relative to the total project area or capacity. ���� e.���� Subject to review by the board, an electric public utility shall be entitled to full and timely cost recovery for all costs incurred in implementation and compliance with this section. ���� f.���� No later than 36 months after adoption of the rules and regulations required pursuant to subsection b. of this section, the board shall adopt rules and regulations, pursuant to the �Administrative Procedure Act,� P.L.1968, c.410 (C.52:14B-1 et seq.), to convert the Community Solar Energy Pilot Program to a permanent program.� The board shall adopt rules and regulations for the permanent program that set forth standards for projects owned by special purpose entities and nonprofit entities.� The rules and regulations shall also: ���� (1)�� limit the capacity of each solar energy project to a maximum of five megawatts; ���� (2) (a) establish a goal for the conditional registration of 225 megawatts of solar energy projects prior to June 1, 2024, with an additional 275 megawatts prior to June 1, 2024 if qualified applications exce
View New Jersey A 5636 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.