South Carolina H 3303: Petroleum Pipelines
Status: Referred to Committee on Labor, Commerce and Industry (as of 2025-01-14)
State: South Carolina · Session: 2025-2026 · Bill: H 3303
Sponsors: Hixon, Taylor
Bill Text
2025-2026 Bill 3303 Text of Previous Version (Dec. 06, 2024) - South Carolina Legislature Online South Carolina General Assembly 126th Session, 2025-2026 Bill 3303 Indicates Matter Stricken Indicates New Matter (Text matches printed bills. Document has been reformatted to meet World Wide Web specifications.) A bill TO AMEND THE SOUTH CAROLINA CODE OF LAWS BY ADDING ARTICLE 3 TO CHAPTER 7, TITLE 58 SO AS TO ESTABLISH PROVISIONS RELATING TO PETROLEUM PIPELINES, TO PROVIDE FOR APPLICATIONS, PERMITTING, AND HEARINGS, TO SET REQUIREMENTS FOR RENDERING FINAL ORDERS, TO PROVIDE FOR REHEARINGS, TO PROMULGATE REGULATIONS, TO ALLOW THE OFFICE OF REGULATORY STAFF TO REQUIRE RECORDS PRODUCTION, TO PROVIDE FOR DISCOVERY, TO EMPLOY EXPERT WITNESSES, TO PROVIDE THAT A PETROLEUM PIPELINE COMPANY MAY REQUEST REASONABLE ACCESS TO PROPERTY ON A PROPOSED SITE FOR SURVEY PURPOSES, TO PROVIDE REPORTING REQUIREMENTS FOR A SPILL OR AN ACCIDENTAL RELEASE, TO PROVIDE FOR EMINENT DOMAIN AND HEARINGS BEFORE THE ADMINISTRATIVE LAW COURT, AND TO DEFINE NECESSARY TERMS; AND TO DESIGNATE SECTIONS 58-7-10 THROUGH 58-7-70 AS ARTICLE 1, ENTITLED "SPECIAL PROVISIONS AFFECTING GAS, WATER, OR PETROLEUM PIPELINE COMPANIES." Be it enacted by the General Assembly of the State of South Carolina: SECTION 1. Chapter 7, Title 58 of the S.C. Code is amended by adding: Article 3 Petroleum Pipelines Section 58-7-300. As used in this article: (1) "Applicant" means a petroleum pipeline company that has submitted an application with the commission seeking the issuance of a permit by ORS for the construction of a new petroleum pipeline or the extension of an existing petroleum pipeline in this State. (2) "Commission" means the Public Service Commission. (3) "Department" means the Department of Environmental Services. (4) "Easement" means a corridor obtained by a petroleum pipeline company for the right of use on or under the property of others for the permanent placement and operation of a petroleum pipeline. (5) "Existing petroleum pipeline" means a petroleum pipeline that a petroleum pipeline company can affirmatively establish to the commission was constructed and in use upon the effective date of this act. (6) "Expansion" means a modification to an existing petroleum pipeline within the existing easement or right of way that increases the supply of petroleum by: (a) increasing the diameter of an existing petroleum pipeline; or (b) constructing a parallel petroleum pipeline. "Expansion" does not include improvements, maintenance, or repairs such as pump station development or pressure increases on an existing petroleum pipeline. (7) "Extension" means a modification to an existing petroleum pipeline that increases the length or footprint of the existing petroleum pipeline or right of way by a distance greater than one linear mile. (8) "Maintenance" means: (a) the care or upkeep of an existing petroleum pipeline and its appurtenances; (b) the replacement of an existing petroleum pipeline within the same easement or right of way; or (c) the relocation of an existing petroleum pipeline for repair within one third of one linear mile from the outer limit of the existing petroleum pipeline's alignment. (9) "New petroleum pipeline" means a petroleum pipeline that was not constructed and in use upon the effective date of this act. The term "new petroleum pipeline" shall not include an expansion, an extension, or any maintenance. (10) "ORS" means the Office of Regulatory Staff. (11) "Parallel petroleum pipeline" means a petroleum pipeline that runs side by side to an existing petroleum pipeline. (12) "Permit" means a permit issued by ORS in compliance with the provisions of an order of the commission authorizing the construction, expansion, or extension of a petroleum pipeline. (13) "Petroleum" means crude oil and any product derived from crude oil, including liquefied petroleum gases, refined petroleum products, or any blend thereof. (14) "Petroleum pipeline" means a fixed conduit of pipe located within South Carolina that transports petroleum products intrastate or interstate. (15) "Petroleum pipeline company" or "company" means a person, partnership, or corporation organized under the laws of this State or another state that is authorized to do business in this State and specifically authorized by its agreement, charter, or articles of incorporation to construct and operate petroleum pipelines for the transportation of petroleum or petroleum products. (16) "Right of way" means a temporary easement obtained by a petroleum pipeline company not to exceed one third of one mile in width for the purpose of establishing a corridor for the surveying and construction of a petroleum pipeline. Section 58-7-310. Construction of any new petroleum pipeline or the extension or expansion of an existing petroleum pipeline in this State shall require a per
View South Carolina H 3303 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.