New York S 5166: Relates to vehicle inspection renewal notification

Status: REFERRED TO TRANSPORTATION (as of 2018-01-03)

State: New York · Session: 2017-2018 · Bill: S 5166

Sponsors: STAVISKY

Bill Text

Bill Search and Legislative Information | New York State Assembly 

• 

• 

• 

• 

• 

• 

• 

• 

 Skip to main content 

 New York State Assembly

 Speaker Carl E. Heastie

 --> 
 --> 

 --> 

• 
 Assembly Members 

• 
 Legislative Info 

• 
 Public Hearings 

• 
 Speaker's Press 

• 
 Assembly Reports 

• 
 Committees & More 

• Bill Search Home
• Laws
• Legislative Calendar
• Public Hearing Schedule
• Assembly Calendars
• Assembly Committee Agenda 

 Javascript must be enabled to properly view this page. 

 Bill No.: 

• Summary 
• Actions 
• Committee&nbspVotes 
• Floor&nbspVotes 
• Memo 
• Text 
• LFIN 
• Chamber&nbspVideo/Transcript 
S05166 Summary:

BILL NOS05166 

&nbsp

SAME ASNo Same As

&nbsp

SPONSORCOMRIE

&nbsp

COSPNSR

&nbsp

MLTSPNSR

&nbsp

Add §1885, Pub Auth L; add §10-124, NYC Ad Cd

&nbsp

Requires anywhere fifth generation (5G) telecommunications towers in cities with a population of one million or more are installed, and there is available street parking, electric vehicle charging stations shall be provided for public use; defines terms; requires such charging stations to be designated and clearly identified.

Go to top S05166 Actions:

BILL NOS05166 

&nbsp

02/19/2025REFERRED TO ENERGY AND TELECOMMUNICATIONS

01/07/2026REFERRED TO ENERGY AND TELECOMMUNICATIONS

Go to topS05166 Committee&nbspVotes:

Go to topS05166 Floor&nbspVotes:

There are no Assembly votes for this bill in this legislative session.

Go to topS05166 Text:

 STATE OF NEW YORK
 ________________________________________________________________________

 5166

 2025-2026 Regular Sessions

 IN SENATE

 February 19, 2025
 ___________

 Introduced by Sen. COMRIE -- read twice and ordered printed, and when
 printed to be committed to the Committee on Energy and Telecommuni-
 cations

 AN ACT to amend the public authorities law and the administrative code
 of the city of New York, in relation to the fifth generation (5G)
 telecommunications towers in cities with a population of one million
 or more and electric vehicle charging stations

 The People of the State of New York, represented in Senate and Assem-
 bly, do enact as follows:

 1 Section 1. The public authorities law is amended by adding a new
 2 section 1885 to read as follows:
 3 § 1885. Fifth generation (5G) telecommunications towers in cities with
 4 a population of one million or more and electric vehicle charging
 5 stations. 1. For purposes of this section, the following terms shall
 6 have the following meanings:
 7 (a) "Fifth generation (5G) telecommunications tower" shall mean any
 8 freestanding tower, monopole or similar structure used for the provision
 9 of fifth generation (5G) wireless services including ancillary telecom-
 10 munications equipment required to integrate such tower, monopole or
 11 similar structure into an existing or proposed wireless network.
 12 (b) "Electric vehicle" shall mean a motor vehicle that is propelled at
 13 least in part by an electric motor and associated power electronics
 14 which provide acceleration torque to the drive wheels sometime during
 15 normal vehicle operation, and that draws electricity from a battery or
 16 hydrogen fuel cell that is capable of being recharged from an external
 17 source of electricity, such that the external source of electricity
 18 cannot be connected to the vehicle while the vehicle is in motion.
 19 (c) "Electric vehicle charging station" shall mean the equipment need-
 20 ed to convey electric power from the electric grid or another power
 21 source to an onboard motor vehicle energy storage system.

 EXPLANATION--Matter in italics (underscored) is new; matter in brackets
 [ ] is old law to be omitted.
 LBD06126-01-5

 S. 5166 2

 1 2. In cities with a population of one million or more, where fifth
 2 generation (5G) telecommunications towers are installed and there is
 3 street parking available, electric vehicle charging stations shall be
 4 provided for public use. Parking spaces designated for the exclusive
 5 purpose of charging an electric vehicle at an electric vehicle charging
 6 station shall be clearly identified, and such designation shall include
 7 conspicuous and permanently installed above grade signs which shall be
 8 positioned from the parking space surface at a height of not less than
 9 five feet nor more than seven feet and which identify such space as an
 10 electric vehicle charging station, indicate that such space is only for
 11 electric vehicle charging and include any day or time restrictions.
 12 § 2. The administrative code of the city of New York is amended by
 13 adding a new section 10-124 to read as follows:
 14 § 10-124 Fifth generation (5G) telecommunications towers and electric
 15 vehicle charging stations. a. For purposes of this section, the follow-
 16 ing terms shall have the following meanings:
 17 1. "Fifth generation (5G) telecommunications tower" means any free-
 18 standing tower, monopole or similar structure used for t

View New York S 5166 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.