Florida HB 1517: Civil Liability for the Wrongful Death of an Unborn Child
Status: Died in Rules (as of 2025-06-16)
State: Florida · Session: 2025 · Bill: HB 1517
Subjects: torts
Sponsors: Civil Justice & Claims Subcommittee, Greco, Bankson, Black, Borrero, Jacques, Michael, Miller, Owen, Plakon, Redondo, Robinson, W., Salzman
Bill Text
HB 1517 2026 CODING: Words stricken are deletions; words underlined are additions. hb1517-00 Page 1 of 7 F L O R I D A H O U S E O F R E P R E S E N T A T I V E S A bill to be entitled 1 An act relating to the approval of data center 2 facilities; providing a short title; creating s. 3 377.714, F.S.; requiring applications for the approval 4 of data center facilities to include specified 5 disclosures; requiring the Department of Environmental 6 Protection to make such information publicly available 7 on its website; providing that such applications may 8 not be approved before such information is posted for 9 a specified period of time; requiring certain local 10 governments to make such information publicly 11 available on local government websites; requiring that 12 written notice be provided to certain residential and 13 commercial landowners and renters; requiring existing 14 data centers to disclose specified information; 15 requiring data centers to comply with specified 16 standards; providing a penalty; prohibiting tax 17 credits for certain facilities; prohibiting certain 18 exemptions, protections, and restrictions for such 19 information; requiring the department to adopt rules; 20 providing an effective date. 21 22 Be It Enacted by the Legislature of the State of Florida: 23 24 Section 1. This act may be cited as the "Data Center 25 HB 1517 2026 CODING: Words stricken are deletions; words underlined are additions. hb1517-00 Page 2 of 7 F L O R I D A H O U S E O F R E P R E S E N T A T I V E S Transparency Act." 26 Section 2. Section 377.714, Florida Statutes, is created 27 to read: 28 377.714 Approval of data center facilities.— 29 (1) Any application for the approval of a data center 30 facility must require a detailed disclosure of the following: 31 (a) A plan for energy management of the electricity or 32 power supply for the data center, including but not limited to: 33 1. The energy sources, such as full or partial self-power. 34 2. If connected to a regulated utility, include impact on 35 the grid. 36 3. Any renewable energy. 37 4. Energy use efficiency, conservation, and use 38 management. 39 5. The carbon footprint from servers. 40 6. Storage equipment. 41 7. Networking devices. 42 8. Uninterruptible power supplies. 43 9. Heating, ventilation, and air conditioning systems and 44 other essential infrastructure, and cost-sharing with other 45 users on the grid, such as nearby residential and commercial 46 consumers for both the operation of electronic information 47 technology equipment and cooling. 48 10. A statement of actual or anticipated greenhouse gas 49 emissions, including direct emissions, such as emissions from 50 HB 1517 2026 CODING: Words stricken are deletions; words underlined are additions. hb1517-00 Page 3 of 7 F L O R I D A H O U S E O F R E P R E S E N T A T I V E S onsite equipment and power generators, and indirect emissions, 51 such as emissions from electricity suppliers, in accordance with 52 the United States Greenhouse Gas Reporting Program. Anticipated 53 versus actual figures should be based on existing measurements 54 by substantially similar data centers under similar climate 55 conditions for the area. 56 11. For those data centers connecting to a public utility 57 grid, an energy cost-sharing statement that includes: 58 a. The results of any agreement negotiated through the 59 rate or tariff setting process with the Public Service 60 Commission regarding large load customers with a demand greater 61 than 75 megawatts who pay monthly minimums equal to 80 percent 62 of their capacity or transmission costs. 63 b. Any collateral requirements. 64 c. Contract termination fees to prevent data centers costs 65 from being laid onto residential and other low load consumers. 66 (b) For data centers using water for cooling or any other 67 purpose, a detailed description of the plan for water management 68 and cooling, including but not limited to: 69 1. The water sources, including whether the water is 70 fresh, purchased from a local water utility, purchased from 71 onsite reservoirs, or from some other source. 72 2. The cooling method, such as moving chilled air through 73 large ductwork, moving chilled water in a piped cooling loop, or 74 room-scale air conditioners. 75 HB 1517 2026 CODING: Words stricken are deletions; words underlined are additions. hb1517-00 Page 4 of 7 F L O R I D A H O U S E O F R E P R E S E N T A T I V E S 3. The amount of water in gallons that is being consumed 76 daily. 77 4. Cost sharing for water resources with local residents 78 and businesses. 79 (c) To proactively avoid any toxic substances being 80 released into the environment, a plan for waste management to 81 dispose of or recycle electronic waste such as racks, computing 82 equipment, monitors, circuits, and other electrical components. 83 (d) A statement of the presence of any emissions from 84 hydrofluorocarbons, which are commonly used as refrigerants for 85 cooling s
View Florida HB 1517 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.