New Jersey A 1059: Requires each public school to post on website comprehensive list of all resources available in school library.

Status: Introduced in the Assembly, Referred to Assembly Education Committee (as of 2024-01-09)

State: New Jersey · Session: 221 · Bill: A 1059

Subjects: EDUCATION, LIBRARIES

Sponsors: Fantasia, Dawn, Kanitra, Paul, McGuckin, Gregory P., DiMaio, John, Inganamort, Michael, Webber, Jay

Bill Text

A1059 

ASSEMBLY, No. 1059 

STATE OF NEW JERSEY

222nd LEGISLATURE

� 

PRE-FILED FOR INTRODUCTION IN THE 2026 SESSION

Sponsored by:

Assemblyman WAYNE P. DEANGELO

District 14 (Mercer and Middlesex)

Assemblywoman MELINDA KANE

District 6 (Burlington and Camden)

Assemblyman JAMES J. KENNEDY

District 22 (Somerset and Union)

SYNOPSIS

���� Requires electric public utilities to submit to BPU 
and implement electric infrastructure improvement plans.

CURRENT VERSION OF TEXT 

���� Introduced Pending Technical Review by Legislative 
Counsel.

�� 

An Act concerning distributed energy sources and supplementing 
Title 48 of the Revised Statutes.

���� Be It 
Enacted by the Senate and General Assembly of 
the State of New Jersey:

����� 1.� 
a.� As used in this section:

����� "Board" 
means the Board of Public Utilities.

����� "Reactive 
power" means the portion of alternating current electricity, measured in 
volt-amperes reactive, that cannot do useful work due to a misalignment of the 
current and voltage waveforms of the electricity.

����� b.� 
The Board of Public Utilities shall require each electric public utility to 
file, no later than 120 days after the effective date of this act, an electric 
infrastructure improvement plan, in accordance with procedures established by 
the board.� The purpose of the plans shall be to reopen many of the State�s 
electric distribution circuits that have been closed to any additional 
renewable energy installations, or restricted to 100 kilowatts or less of 
remaining circuit capacity.� A plan shall not be required to include 
infrastructure improvements to the electric transmission system.� Each plan 
shall include provisions for:

����� (1) 
permitting the flow of electricity, through an electrical substation, from the 
distribution system to the transmission system;

����� (2) 
requiring those solar inverters that are located on closed circuits to utilize 
standard smart inverter technology that allows the inverter to inject and 
absorb reactive power;

����� (3) 
requiring those energy storage systems that are located on closed circuits to 
utilize standard smart inverter technology that allows the energy storage 
system to inject and absorb real and reactive power; and

����� (4) 
any additional low-cost and highly actionable� non-wires alternatives 
identified by an electric public utility as a potential means to reopen closed 
electric distribution circuits to renewable energy installations.

����� c.� 
No later than 300 days after the effective date of this act, the board shall 
review and may approve, approve with modifications, or disapprove each electric 
infrastructure improvement plan that the board deems to be complete.� As a 
condition of approval, the board shall require each electric public utility to:

����� (1) 
submit performance metrics and reports to the board, showing whether the 
implementation of the electric infrastructure improvement plan has resulted in 
additional distributed energy resource interconnection approvals, including an 
accounting of all interconnection approvals, the types of distributed energy 
resource projects that were approved, and the total capacity of distributed 
energy resource projects that were approved because of the implementation of 
the plan, and

���� (2) 
schedule the associated work to be completed in a reasonable and prudent manner 
at the earliest date possible.

���� 2.� This act shall take effect 
immediately.

STATEMENT

���� This bill would require each 
electric public utility in the State to submit, within 120 days after the 
bill's enactment, an electric infrastructure improvement plan to the Board of 
Public Utilities (BPU) for approval.� The purpose of the plan would be to 
reopen many of the State�s electric distribution circuits that have been closed 
to any additional renewable energy installations, or restricted to 100 
kilowatts or less of remaining circuit capacity.

���� The bill would require each 
plan to contain certain provisions, as enumerated in subsection b. of section 1 
of the bill, as well as any additional provisions included by the utility.� The 
bill would require the BPU to approve, approve with modifications, or 
disapprove each plan within 300 days after the bill's enactment.� Each utility 
would be required to schedule the work associated with each plan at the 
earliest date possible.

View New Jersey A 1059 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.