North Carolina HB 1129: 2003 Omnibus Labor Law Changes.
Status: Signed By Gov. 7/4/2003 (as of 2003-07-07)
State: North Carolina · Session: 2003 · Bill: HB 1129
Subjects: CIVIL PROCEDURE, COURTS, EMPLOYMENT, FISCAL NOTES, LABOR DEPT., LICENSES & PERMITS, NOTIFICATION, PERSONNEL, PRESENTED, PUBLIC, RATIFIED, SECURITY SERVICES, TITLE CHANGE, REP. FOX, REP. WEST, CHAPTERED
Sponsors: Fox, West
Bill Text
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 H 1 HOUSE BILL 1129 Short Title: Balcony Solar. (Public) Sponsors: Representatives Cook, Harrison, Cervania, and Rubin (Primary Sponsors). For a complete list of sponsors, refer to the North Carolina General Assembly web site. Referred to: Rules, Calendar, and Operations of the House April 30, 2026 *H1129-v-1* A BILL TO BE ENTITLED 1 AN ACT TO AUTHORIZE THE USE OF SMALL PORTABLE SOLAR ENERGY 2 GENERATION DEVICES. 3 The General Assembly of North Carolina enacts: 4 SECTION 1. G.S. 62-126.3 is amended by adding a new subdivision to read: 5 "(11a) Portable solar energy generation device. – A moveable device that generates 6 electricity from a solar photovoltaic system, limited to a capacity of not more 7 than 1.2 kilowatts (kW), and is designed to be connected to a building's 8 electrical system through a standard 120-volt alternating current outlet." 9 SECTION 2.(a) Article 6B of Chapter 62 of the General Statutes is amended by 10 adding a new section to read: 11 "§ 62-126.15. Portable solar energy generation devices. 12 (a) A customer of an electric power supplier may install and operate a portable solar 13 energy generation device, provided that all of the following requirements are met: 14 (1) The operation of the portable solar energy generation device is primarily 15 intended to offset part of the customer's own electricity use and not for the 16 primary purpose of producing electricity for sale to or for the public for 17 compensation. 18 (2) The installation and operation of the portable solar energy generation device 19 meets all applicable standards of the North Carolina Electrical Code. 20 (3) The portable solar energy generation device is certified by Underwriters 21 Laboratories or an equivalent nationally recognized testing laboratory. 22 (4) The portable solar energy generation device incorporates a mechanism or 23 feature that prevents the device from energizing the building's electrical 24 system during a power outage. 25 (5) The customer notifies the electric power supplier in accordance with 26 subsection (c) of this section. 27 (b) An electric power supplier shall not require a customer who operates a portable solar 28 energy generation device to do any of the following as a condition of receiving services from the 29 electric power supplier: 30 (1) Enter into an interconnection agreement or otherwise obtain the electric power 31 supplier's approval before installing or using the portable solar energy 32 generation device. 33 (2) Pay any fee or charge related to the installation or use of a portable solar 34 energy generation device. 35 General Assembly Of North Carolina Session 2025 Page 2 House Bill 1129-First Edition (3) Install any additional controls or equipment beyond what is required by 1 subsection (a) of this section. 2 (c) A customer shall notify the electric power supplier, using a standardized form 3 prescribed by the Commission, at least 15 days prior to operating a portable solar energy 4 generation device. 5 (d) An electric power supplier is not liable for any damage or injury caused by a portable 6 solar energy generation device." 7 SECTION 2.(b) No later than 90 days after the effective date of this act, the 8 Commission shall adopt and make available a standardized notice form for customers who intend 9 to operate a portable solar energy generation device. This form shall only require a customer to 10 submit the following information to the electric power supplier for the purpose of complying 11 with the notification requirement: the customer's name and contact information, the address 12 where the portable solar energy generation device will be installed, the customer's account 13 number with the electric power supplier, and the model name and model number of the device. 14 SECTION 3. G.S. 62-110.1(g) reads as rewritten: 15 "(g) The certification requirements of this section shall not apply to (i) a nonutility-owned 16 generating facility fueled by clean energy resources under two megawatts in capacity; (ii) to 17 persons who construct an electric generating facility primarily for that person's own use and not 18 for the primary purpose of producing electricity, heat, or steam for sale to or for the public for 19 compensation; or (iii) a solar energy facility or a community solar energy facility, as provided by 20 and subject to the limitations of Article 6B of this Chapter. However, such persons shall be 21 required to report the proposed construction of the facility and the completion of the facility to 22 the Commission and the interconnecting public utility. Such reports shall be for informational 23 purposes only and shall not require action by the Commission or the Public Staff. The reporting 24 requirements of this subsection shall not apply to the construction or installation of a portable 25 solar energy generation device as defined in G.S. 62-126.3." 26 SECTION 4. G.S. 62-126.4 reads as rewritten: 27 "§ 62-126.4.
View North Carolina HB 1129 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.