Missouri HB 2730: Changes the law regarding public works contracts
Status: Referred: Local Government(H) (as of 2018-05-18)
State: Missouri · Session: 2018 · Bill: HB 2730
Subjects: CONTRACTS AND CONTRACTORS, POLITICAL SUBDIVISIONS
Sponsors: Andrews, Allen
Bill Text
SECOND REGULAR SESSION HOUSE BILL NO. 2730 99TH GENERAL ASSEMBLY INTRODUCED BY REPRESENTATIVE ANDREWS. 6730H.01I D. ADAM CRUMBLISS, Chief Clerk AN ACT To repeal sections 67.5050 and 67.5060, RSMo, and to enact in lieu thereof two new sections relating to public works contracts. Be it enacted by the General Assembly of the state of Missouri, as follows: Section A. Sections 67.5050 and 67.5060, RSMo, are repealed and two new sections 2 enacted in lieu thereof, to be known as sections 67.5050 and 67.5060, to read as follows: 67.5050. 1. As used in this section, the following terms mean: 2 (1) “Construction manager”, the legal entity that proposes to enter into a construction 3 [management] manager-at-risk contract under this section; 4 (2) “Construction manager-at-risk”, a sole proprietorship, partnership, corporation, or 5 other legal entity that assumes the risk for the construction, rehabilitation, alteration, or repair 6 of a project at the contracted price as a general contractor and provides consultation to a political 7 subdivision regarding construction during and after the design of the project. 8 2. Any political subdivision may use the construction manager-at-risk method for: civil 9 works projects such as roads, streets, bridges, utilities, water supply projects, water plants, 10 wastewater plants, water distribution and wastewater conveyance facilities, airport runways and 11 taxiways, storm drainage and flood control projects, or transit projects commonly designed by 12 professional engineers [in excess of two million dollars]; and noncivil works projects such as 13 buildings, site improvements, and other structures, habitable or not, commonly designed by 14 architects [in excess of three million dollars]. In using that method and in entering into a 15 contract for the services of a construction manager-at-risk, the political subdivision shall follow 16 the procedures prescribed by this section. EXPLANATION — Matter enclosed in bold-faced brackets [thus] in the above bill is not enacted and is intended to be omitted from the law. Matter in bold-face type in the above bill is proposed language. HB 2730 2 17 3. The political subdivision shall publicly disclose at a regular meeting its intent to 18 utilize the construction [management] manager-at-risk method and its selection criteria at least 19 one week prior to publishing the request for qualifications. Before or concurrently with selecting 20 a construction manager-at-risk, the political subdivision [shall] may select or designate an 21 engineer or architect who shall prepare the construction documents for the project and who shall 22 comply with all state laws, as applicable. If the engineer or architect is not a full-time employee 23 of the political subdivision, the political subdivision [shall] may select the engineer or architect 24 on the basis of demonstrated competence and qualifications as provided by sections 8.285 to 25 8.291. The political subdivision’s engineer or architect for a project [may] shall not serve, alone 26 or in combination with another, as the construction manager-at-risk. This subsection does not 27 prohibit a political subdivision’s engineer or architect from providing customary construction 28 phase services under the engineer’s or architect’s original professional service agreement in 29 accordance with applicable licensing laws. 30 4. The political subdivision may provide or contract for, independently of the 31 construction manager-at-risk, inspection services, testing of construction materials, engineering, 32 and verification of testing services necessary for acceptance of the project by the political 33 subdivision. 34 5. The political subdivision shall select the construction manager-at-risk in a two-step 35 process. The political subdivision shall prepare a request for qualifications, for the case of the 36 first step of the two-step process, that includes general information on the project site, project 37 scope, schedule, selection criteria, and the time and place for receipt of proposals or 38 qualifications, as applicable, and other information that may assist the political subdivision in 39 its selection of a construction manager-at-risk. The political subdivision shall state the selection 40 criteria in the request for proposals or qualifications, as applicable. The selection criteria may 41 include the construction manager’s experience, past performance, safety record, proposed 42 personnel and methodology, and other appropriate factors that demonstrate the capability of the 43 construction manager-at-risk. The political subdivision shall not request fees or prices in step 44 one. In step two, the political subdivision may request that five or fewer construction managers, 45 selected solely on the basis of qualifications, provide additional information, including the 46 construction manager-at-risk’s proposed fee and its price for fulfilling the general conditions. 47 Qualifications shall account for
View Missouri HB 2730 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.