Massachusetts S 3143: Amendment S.3143

Status: See H5175 (as of 2026-07-01)

State: Massachusetts · Session: 194th · Bill: S 3143

Sponsors: Senate Committee on Ways and Means

Summary

Legislative Analysis: Senate No. 3143 "An Act to Save People Money, Repair the Climate and Grow the Economy" Massachusetts 194th General Court (2025-2026) --- 1. PRIMARY PURPOSE AND POLICY OBJECTIVES Senate No. 3143 is a comprehensive clean energy omnibus bill with three principal policy objectives: 1. Ratepayer Affordability: Restructure utility billing transparency, program cost controls, and rate impact oversight to reduce consumer energy burdens 2. Climate Compliance: Accelerate greenhouse gas emissions reductions consistent with Chapter 21N statutory limits and sublimits, with emphasis on building decarbonization and elimination of fossil fuel end uses 3. Economic Competitiveness: Stimulate clean energy industry development through procurement mandates, workforce development requirements, and expanded technology incentive frameworks The bill represents a fundamental reorientation of the Commonwealth's energy efficiency framework—transitioning from a traditional demand-side management model toward an integrated building decarbonization paradigm while centralizing clean energy procurement authority within the Department of Energy Resources (DOER). --- 2. KEY PROVISIONS AND MECHANISMS A. Building Decarbonization and Energy Efficiency Program Restructuring (Sections 7–15) Program Administration Transfer: - Gas distribution companies are expressly prohibited from administering building decarbonization or energy efficiency programs (new §21(d)(1), Chapter 25) - Program administration is consolidated under electric distribution companies and municipal aggregators with certified energy plans - Gas companies may provide marketing/outreach support services and earn performance incentives in an ancillary capacity (§21(d)(2)) - The Department of Public Utilities (DPU) may designate municipal light plants as program administrators in hybrid-service territories Statewide Building Decarbonization and Energy Efficiency Investment Plan: - Triennial planning cycle replaces prior planning framework; plans submitted by October 31 and approved within 120 days - Plan must include cost-effectiveness analysis at the sector level (benefit-cost ratio > 1.0), incorporating social value of GHG emissions reductions as a benefit metric - Mandatory set-aside: Not less than 20% of statewide plan funds allocated to low-income residential sector - Plans may not fund incentives for new fossil fuel equipment except for: low-income households, emergency facilities, hospitals, heat pump backup thermal sources where technically/economically necessary, and hard-to-electrify industrial processes - Administrative/planning expenditures capped at 5% of total 3-year expenditures Funding Restructuring: - RGGI auction proceeds (not less than 80%) directed to program funding - Gas company ratepayer funds redirected to electric distribution companies/municipal aggregators per DOER-approved methodology - Annual mandatory transfer of not less than $12,000,000 to the Climatetech Investment Fund (Chapter 23J, §15) - Programs funded by a fully reconciling building decarbonization and energy efficiency surcharge Enforcement: - Noncompliance fines of up to $0.05 per kilowatt-hour times the shortfall in kilowatt-hours saved, paid to DOER within 60 days; fines not recoverable from ratepayers; municipal aggregators exempt from fines B. Energy Efficiency Advisory Council Reconstitution (Section 15, new §22) - Membership expanded to 19 voting members representing diverse stakeholders including organized labor (AFL-CIO recommended), building decarbonization policy experts, banking/lending institutions, municipal representatives, and the Massachusetts Association of Realtors - Mandatory affordability subcommittee of not fewer than 5 members, chaired by gubernatorial appointee - Council chair: Commissioner of DOER - 2/3 supermajority vote required for plan/budget approval - Consultant retention authorized (capped at 1% of efficiency funding annually); consultants must be independent of utility company affiliations - Quarterly reporting requirements from program administrators to the council C. Clean Energy Centralized Procurement Authority (Section 33, new §22 of Chapter 25A) Resource Solicitation Plan: - DOER required to publish a resource solicitation plan establishing clean energy procurement targets, solicitation schedules (3-year rolling), and economic development objectives - DPU reviews and approves/rejects the plan within 7 months of submission - Statutory procurement mandates embedded in plan requirements: - Offshore wind: Not less than 10 gigawatts of aggregate nameplate capacity by December 31, 2040 - Solar: Not less than 10 gigawatts of aggregate nameplate capacity by December 31, 2040 Long-Term Contracts: - DOER authorized to negotiate and execute long-term contracts (up to 30 years) for environmental attributes or energy services - DPU approval required; 90-day review timeline - Distribution companies recover contract costs through DPU-approved tariffs; companies receive no remuneration, benefit, or fee for contract administration - Price adjustment mechanism established for substantial and unforeseeable changes in law or costs beyond party control, subject to DPU review Central Procurement Fund: - Separate non-budgeted special revenue fund administered by DOER - Credited with distribution company tariff revenues and other authorized funds Competitive Solicitation Requirements: - Bidders must document workforce development commitments, apprenticeship program participation, supplier diversity plans, labor law compliance history (Chapters 149, 151, 151A, 151B, 152; FLSA), and safety record - Debarred contractors disqualified for debarment term - Preference for proposals demonstrating binding commitments to Commonwealth economic benefits - Confidential bid files required documenting capital cost assumptions for price adjustment proceedings D. Renewable Portfolio Standard (RPS) Modifications (Section 26) Amended escalation schedule for Class I RPS compliance: - 3% annual increases through December 31, 2026 - 1% annual increases through December 31, 2030 - 3% annual increases through December 31, 2033 - 2% annual increases through December 31, 2036 - 1% annual increases thereafter E. Alternative Portfolio Standard (APS) Sunset Provisions (Section 27) - Application deadline established: No new biomass or combined heat and power sources eligible unless a complete application is submitted on or before January 1, 2028 - Coal, petroleum coke, oil, and nuclear power expressly excluded as alternative energy generating sources F. Definitional Expansions (Sections 3–4, 19–20) - "Clean thermal energy": Formally defined as renewable, noncombustion-sourced energy (geothermal, wastewater, waste heat, solar, ambient air); may be distributed through networked systems; must be zero-GHG - "Geothermal energy": Broad definition encompassing surface/subsurface ground sources, bedrock, surface water, and groundwater; includes deep geothermal - Both definitions incorporated into DOER's statutory mandate, clean energy research definitions, and program eligibility determinations G. DOER Structural Reorganization (Section 18) New division structure within DOER: 1. Division of Energy Efficiency 2. Division of Renewable and Alternative Energy Development 3. Division of Green Communities 4. Division of Clean Energy Procurement (new) 5. Division of Clean Energy Siting and Permitting (new) Each division headed by a commissioner-appointed director serving at the commissioner's pleasure. H. Ratepayer Bill Transparency (Section 17, new §24 of Chapter 25) - DPU required to maintain a real-time, online, machine-readable retail residential customer bill assessment dashboard with historical and current bill component data for all gas and electric companies - DPU must conduct comprehensive customer bill assessment investigations within 180 days of enactment, updated at not more than 3-year intervals - Investigations must include 10-year historical cost component analysis, six-state comparative analysis (MA, ME, VT, NH, RI, CT), and assessment of monthly bill volatility thresholds - Benefits analysis of clean energy programs must be included on the dashboard I. Electric Vehicle Incentive Fund (Sections 1, 32) - Electric Vehicle Adoption Incentive Trust Fund restructured: RGGI Auction Trust Fund designated as primary funding source (subject to sufficient proceeds) - DOER must expend amounts sufficient to pay all qualified rebates and financial incentives - Supplemental funding from APS, RPS, and solar carve-out alternative compliance payments if fund is projected to be insufficient J. Energy Storage Incentive Program (Section 31, new §17A of Chapter 25A) - Permissive (not mandatory) authority for DPU to develop a statewide energy storage incentive program - Program criteria include: market stability, system cost consideration, equitable cost distribution among all ratepayers, and long-term investor certainty - Environmental attributes from incentivized storage resources eligible for retail supplier compliance K. Customer Data Privacy (Section 15, §21(i)) - Energy audit and decarbonization service data classified as non-public record; exempt from public records law (Chapter 66, §10) - Confidentiality exceptions enumerated: customer, subsequent purchaser, utilities, authorized vendors, DOER, EOEEA - Tenant right to inspect energy audit reports for their building preserved - Data sharing between utilities/aggregators/municipal light plants permitted as approved by DPU for integrated energy planning L. Heating Oil and Propane Price Transparency (Section 24) - Retail petroleum product suppliers required to make daily delivery prices publicly available in a clear and conspicuous manner - Website operators must prominently display daily delivery prices --- 3. FISCAL IMPACT Note: Bill text provided is partial (163 pages); complete fiscal analysis may require review of remaining sections. Direct Fiscal Mechanisms Identifiable: - Mandatory annual transfer of $12,000,000 from electric distribution company/municipal aggregator program funds to Climatetech Investment Fund - Central Procurement Fund established as off-budget special revenue fund; costs borne by ratepayer tariffs, not General Fund appropriations - EV Adoption Incentive Trust Fund primarily funded from RGGI auction proceeds (existing revenue stream); no new General Fund appropriation identified - Noncompliance fines directed to DOER; not deposited in General Fund Ratepayer Impacts: - Building decarbonization surcharge (successor to energy efficiency charge) maintained with cost-effectiveness guardrails - Gas ratepayer funds redirected to electric utility programs; net impact on gas customers indeterminate without rate case data - RPS escalation schedule may increase alternative compliance payment obligations and associated retail electricity costs - 10 GW offshore wind and 10 GW solar procurement mandates represent potentially significant long-term ratepayer obligations contingent on contract pricing - Price adjustment mechanisms for contracted resources introduce upward rate risk if substantial cost changes materialize Indeterminate Elements: - Total budgetary impact of centralized procurement contracts (30-year duration; prices not established) - Net savings from program consolidation and gas utility administration elimination - Independent fiscal note not included in provided text --- 4. AFFECTED STAKEHOLDERS | Stakeholder | Impact | |---|---| | Electric distribution companies | Expanded program administration role; assume gas program functions; subject to performance incentives and noncompliance fines | | Gas distribution companies | Significantly curtailed role; prohibited from program administration; ratepayer funds redirected away; limited to ancillary marketing functions | | Municipal light plants | Potentially designated as program administrators; non-voting advisory council representation | | Municipal aggregators with certified energy plans | Co-equal role in plan development and administration; eligible for performance incentives; exempt from noncompliance fines | | Low- and moderate-income ratepayers | Minimum 20% program fund set-aside; mandatory equitable access strategies; sliding-scale subsidy considerations | | Residential tenants | Preserved right to inspect building energy audit reports | | Offshore wind and solar developers | Statutory mandate creates significant procurement pipeline; subject to enhanced workforce and labor compliance requirements | | Clean thermal energy/geothermal industry | Newly defined and explicitly eligible for program support and incentives; expanded market access | | Organized labor | AFL-CIO representation on advisory council; apprenticeship and labor law compliance requirements embedded in procurement | | Retail heating oil/propane suppliers | New daily price transparency and reporting requirements | | DOER | Significantly expanded authority and operational responsibilities; new divisional structure required | | DPU | Expanded oversight role for procurement contracts, tariff approvals, and price adjustment proceedings | | Office of Attorney General | Consultative role in solicitation methodology and price adjustment review | | Climatetech sector (Chapter 23J) | Expanded definitions; $12M annual transfer from efficiency funds | --- 5. NOTABLE AMENDMENTS AND CONTROVERSIES Procedural Posture: The bill originates as a Senate Ways and Means Committee substitute, striking all language from House Bill 5175 and incorporating text from ten prior Senate bills (Nos. 2228, 2232, 2239, 2249, 2255, 2262, 2281, 2282, 2612, and 2780). This wholesale substitution is a significant procedural mechanism reflecting substantive policy disagreement between chambers and/or substantial Senate policy development independent of the House version. Key Substantive Controversies (Identifiable from Bill Text): 1. Gas Utility Program Exclusion: The categorical prohibition on gas distribution company program administration (§21(d)(1)) represents a politically contentious structural change. The bill effectively redirects gas ratepayer surcharge revenues to electric utilities—a significant transfer of institutional authority and revenue with likely opposition from gas distribution companies and their ratepayers. 2. RPS Escalation Schedule: The modified escalation schedule in Section 26—notably the deceleration to 1% annual increases between 2026 and 2030 before re-accelerating—may reflect compromise on near-term ratepayer cost concerns versus climate advocacy positions favoring steeper and more consistent trajectories. 3. APS Application Deadline (January 1, 2028): The sunset on new biomass and CHP qualification effectively phases out these technologies from the alternative portfolio standard. This provision likely faced opposition from biomass facility operators and combined heat and power advocates. 4. Nuclear Fission Inclusion: The explicit inclusion of nuclear fission in the definitions of "clean energy" and "clean energy research" (Section 3) and its exclusion from the APS prohibited technology list represents a notable policy shift, potentially controversial given Massachusetts's historical policy posture toward nuclear power. 5. Fusion Energy: Explicit inclusion of fusion energy in clean energy definitions signals forward-looking technology neutrality but may be viewed as aspirational given commercial fusion's pre-commercial status. 6. Offshore Wind and Solar Procurement Mandates: The statutory 10 GW mandates for each technology by 2040 represent among the most aggressive procurement targets in the nation. Given recent offshore wind contract cancellations and cost escalation in the Commonwealth, these targets may face significant implementation challenges and ratepayer cost scrutiny. 7. Price Adjustment Mechanism: The provision allowing post-award, pre-commercial operation date price adjustments for offshore wind and other contracted resources (§22(j)) directly responds to the 2023-2024 controversy in which developers sought contract renegotiation or cancellation. The mechanism attempts to provide developer flexibility while protecting ratepayers—a balance likely to remain contentious. 8. Section 16 Amendment: Section 16 immediately strikes paragraph (2) of subsection (d) of the newly inserted §21, which had provided that gas companies not owned by a corporate parent operating an electric distribution company in the Commonwealth could provide ancillary services. This same-bill amendment creates an internal inconsistency suggesting last-minute drafting changes and potential unresolved policy negotiations regarding independent gas company roles. 9. Mandatory Affordability Subcommittee: The creation of a governor-chaired affordability subcommittee within the advisory council reflects legislative recognition of significant constituent concern regarding program cost impacts on utility bills, suggesting this was a floor consideration or inter-branch negotiating point. 10. Data Privacy Exemption from Public Records Law: The categorical exemption of energy audit and decarbonization data from Chapter 66 public records requirements (while preserving tenant access rights) may raise transparency concerns from open government advocates. --- Analysis based on Senate No. 3143 as reported by Senate Ways and Means Committee, June 25, 2026. Bill text reviewed through page 39 of 163; provisions in unreproduced sections not analyzed.

Bill Text

SENATE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  No. 3143 
 
The Commonwealth of Massachusetts 
_______________
 
In the One Hundred and Ninety-Fourth General Court 
(2025-2026) 
_______________
 
 
 
SENATE, June 25, 2026. 
 The committee on Senate Ways and Means to whom was referred the House Bill relative 
to energy affordability, clean power and economic competitiveness (House, No. 5175) (also 
based on Senate, Nos. 2228, 2232, 2239, 2249, 2255, 2262, 2281, 2282, 2612 and 2780); reports, 
recommending that the same ought to pass with an amendment striking out all after the enacting 
clause and inserting in place thereof the text of Senate document numbered 3143; and by striking 
out the title and inserting in place thereof the following title: "An Act to save people money, 
repair the climate and grow the economy". 
 
For the committee, 
 Michael J. Rodrigues 
 

 
1 of 163 
SENATE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  No. 3143 
 
 
The Commonwealth of Massachusetts 
 
_______________
 
In the One Hundred and Ninety-Fourth General Court 
(2025-2026) 
_______________
 
 
1 SECTION 1. Paragraph (1) of subsection (c) of section 22 of chapter 21A of the General 
2Laws, as appearing in the 2024 Official Edition, is hereby amended by inserting the following 
3clause:- (i) to fund the Electric Vehicle Adoption Incentive Trust Fund established in section 19 
4of chapter 25A; 
5 SECTION 2. Chapter 21N of the General Laws is hereby amended by striking out section 
63B, as so appearing, and inserting in place thereof the following section:- 
7 Section 3B. Upon the department approving a new plan under section 21 of chapter 25, 
8the secretary shall set a goal, expressed in tons of carbon dioxide equivalent, for the plan’s 
9contribution to meeting each statewide greenhouse gas emissions limit and sublimit adopted 
10pursuant to this chapter.  
11 SECTION 3. Section 1 of chapter 23J of the General Laws, as so appearing, is hereby 
12amended by striking out the definitions of “Clean energy” and “Clean energy research” and 
13inserting in place thereof the following 2 definitions:- 
14 “Clean energy”, advanced and applied technologies that significantly reduce or eliminate 
15the use of energy from nonrenewable sources, including, but not limited to: (i) energy efficiency; 
16(ii) demand response; (iii) energy conservation; (iv) carbon dioxide removal; (v) embodied 

 
2 of 163 
17carbon reduction; or (vi) technologies powered, in whole or in part, by the sun, wind, water, 
18clean thermal energy, geothermal energy, including networked geothermal and deep geothermal 
19energy, hydrogen produced by non-fossil fuel sources and methods, alcohol, fuel cells, fusion 
20energy, nuclear fission or any other renewable, nondepletable or recyclable fuel; provided, 
21however, that “clean energy” shall include an alternative energy generating source as defined in 
22clauses (i) to (vi), inclusive, of subsection (a) of section 11F½ of chapter 25A.  
23 “Clean energy research”, advanced and applied research in new clean energy 
24technologies, including: (i) solar photovoltaic; (ii) solar thermal; (iii) wind power; (iv) clean 
25thermal energy including but not limited to, geothermal energy, including networked geothermal 
26and deep geothermal energy; (v) wave and tidal energy; (vi) advanced hydropower; (vii) energy 
27transmission and distribution; (viii) energy storage; (ix) renewable biofuels, including ethanol, 
28biodiesel and advanced biofuels; (x) renewable, biodegradable chemicals; (xi) advanced thermal-
29to-energy conversion; (xii) fusion energy; (xiii) hydrogen produced by non-fossil fuel sources 
30and methods; (xiv) carbon capture and sequestration; (xv) carbon dioxide removal; (xvi) energy 
31monitoring; (xvii) green building materials and embodied carbon reduction; (xviii) energy 
32efficiency; (xix) energy-efficient lighting; (xx) gasification and conversion of gas to liquid fuels; 
33(xxi) industrial energy efficiency; (xxii) demand-side management; (xxiii) fuel cells; and (xxiv) 
34nuclear fission; provided, however, that “clean energy research” shall not include advanced and 
35applied research in coal, oil or natural gas. 
36 SECTION 4. Section 8 of said chapter 23J, as so appearing, is hereby amended by 
37striking out clause (x) and inserting in place thereof the following clause:- (x) clean thermal 
38energy, geothermal energy, including networked geothermal and deep geothermal energy; and 

 
3 of 163 
39 SECTION 5. Subsection (f) of section 9 of said chapter 23J, as so appearing, is hereby 
40amended by striking out the first sentence and inserting in place thereof the following sentence:- 
41For the purposes of expenditures from the trust fund, “renewable energy technologies eligible for 
42assistance” shall mean technologies eligible as class I or class II renewable energy generating 
43sources under section 11F of chapter 25A, microcombined heat and power units less than 60 
44kilowatts, solar h

View Massachusetts S 3143 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.