Pennsylvania HB 2223: An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in service and facilities, providing for advanced transmission technologies.
Status: Referred to Consumer Protection & Professional Licensure (as of 2026-05-07)
State: Pennsylvania · Session: 2025-2026 · Bill: HB 2223
Sponsors: Elizabeth Fiedler, Ben Waxman, Carol Hill-Evans, Tarah Probst, Chris Pielli, Jose Giral, La'Tasha Mayes, Lisa Borowski, John Inglis Iii, Nikki Rivera, Johanny Cepeda-Freytiz, Maureen Madden, Keith Harris, Heather Boyd, Gina Curry, Liz Hanbidge, Sean Dougherty, Tina Davis, Jeremy Shaffer, Abigail Salisbury
Bill Text
PRIOR PRINTER'S NOS. 2952, 3177 PRINTER'S NO. 3321 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. 2223 Session of 2026 INTRODUCED BY FIEDLER, WAXMAN, HILL-EVANS, PROBST, PIELLI, GIRAL, MAYES, BOROWSKI, INGLIS, RIVERA, CEPEDA-FREYTIZ, MADDEN, K. HARRIS, BOYD, CURRY, HANBIDGE AND DOUGHERTY, MARCH 3, 2026 AS AMENDED ON SECOND CONSIDERATION, HOUSE OF REPRESENTATIVES, APRIL 29, 2026 AN ACT Amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in service and facilities, providing for advanced transmission technologies. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Title 66 of the Pennsylvania Consolidated Statutes is amended by adding a section to read: § 1504.1. Advanced transmission technologies. (a) Applicability.--This section shall apply to each transmission siting application filed with the commission under 52 Pa. Code Ch. 57 Subch. G (relating to commission review of siting and construction of electric transmission lines) and each letter of notification in lieu of application filed with the commission under 52 Pa. Code Ch. 57 (relating to electric service). (b) Evidence REPORT of evaluation.--An applicant shall provide to the commission evidence A REPORT DOCUMENTING that the <--<-- <--<-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 applicant evaluated and assessed the use of advanced transmission technologies for any of the following: (1) Existing transmission infrastructure. (2) Proposed transmission infrastructure and upgrades identified in the application or letter of notification, including infrastructure for which the proposed voltage would be increased above existing levels and infrastructure that would be reconductored or reconstructed within the jurisdiction of the commission. (c) Commission determination.--The commission may not grant an application or approve a letter of notification under subsection (a), either as proposed or as modified, unless the commission determines, in addition to any other applicable requirements under State law, that the proposed transmission infrastructure incorporates all technically feasible and cost- effective advanced transmission technologies. (C) REBUTTABLE PRESUMPTION.--WHERE AN APPLICANT INCLUDES AN ANALYSIS OF ADVANCED TRANSMISSION TECHNOLOGIES, THERE SHALL BE A REBUTTABLE PRESUMPTION THAT THE ELECTRIC DISTRIBUTION COMPANY HAS CONSIDERED APPROPRIATE ADVANCED TRANSMISSION TECHNOLOGIES FOR THE PROPOSED TRANSMISSION INFRASTRUCTURE. (D) CONDITIONAL APPROVAL.--IF, UPON CONSIDERATION OF RECORD EVIDENCE, THE COMMISSION DETERMINES IT IS IN THE PUBLIC INTEREST, THE COMMISSION MAY, AS A CONDITION OF APPROVING AN APPLICATION, AND IN ADDITION TO ANY OTHER RELIEF GRANTED, ORDER THE APPLICANT TO INTEGRATE ADVANCED TRANSMISSION TECHNOLOGIES TO HELP FULLY OR PARTIALLY RESOLVE THE NEED IDENTIFIED IN THE APPLICATION. (E) COMPETITIVE BIDS.--FOR EACH TRANSMISSION SITING APPLICATION SUBJECT TO A COMPETITIVE BID PROCESS, THE COMMISSION 20260HB2223PN3321 - 2 - <-- <-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 SHALL GIVE FULL CONSIDERATION FOR THE REGIONAL BENEFITS IDENTIFIED IN THE APPLICATION. (d) (F) Commission requirements.--No later than one year after the effective date of this subsection, the commission shall adopt regulations, orders or statements of policy specifying the advanced transmission technology assessment requirements and methods that an applicant shall use to satisfy subsection (b). (e) (G) Construction.--Nothing in this section shall be construed to limit the commission's authority under any other provision of State law to regulate a public utility service or facility. (f) (H) Definitions.--As used in this section, the following words and phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise: "Advanced power flow controller." A hardware or software technology that modulates circuit impedance or other electrical properties to reroute power flows. "Advanced transmission technologies." Any of the following: (1) Grid-enhancing technologies, including dynamic line rating, advanced power flow controller and topology optimization software. (2) High-performance conductors. (3) Any other technology identified by the commission that may avoid the construction of new transmission infrastructure, increase the capacity, efficiency or reliability of the transmission system, reduce transmission system congestion, reduce environmental impacts or provide other benefits to the transmission system. "Aluminum conductor steel reinforced conductor." A stranded 20260HB2223PN3321 - 3 - <--<-- <--<-- <--<-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 overhead electrical conductor composed of one or more layers of hard-drawn aluminum wire helically laid around a central core of galvanized or otherwise coated steel strands, designed to provide enhanced tensile strength and electric
View Pennsylvania HB 2223 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.