South Carolina H 4709: Cursive writing coursework
Status: Referred to Committee on Education (as of 2024-03-05)
State: South Carolina · Session: 2023-2024 · Bill: H 4709
Sponsors: Atkinson, Ballentine, Bernstein, Bradley, Bustos, Erickson, Gilliard, Hart, Hartnett, Henegan, Herbkersman, King, Landing, McDaniel, McGinnis, Pedalino, Rivers, Schuessler
Bill Text
2025-2026 Bill 4709 Text of Previous Version (Jun. 26, 2026) - South Carolina Legislature Online South Carolina General Assembly 126th Session, 2025-2026 Bill 4709 Indicates Matter Stricken Indicates New Matter (Text matches printed bills. Document has been reformatted to meet World Wide Web specifications.) Conference Report Adopted - Not Printed June 25, 2026 H. 4709 Introduced by Reps. Yow, C. Mitchell, M. M. Smith, Williams, Willis, Schuessler, Erickson, Bradley, Kirby, Brewer and Anderson S. Printed 6/25/26--H. Read the first time January 13, 2026 ________ A bill TO AMEND THE SOUTH CAROLINA CODE OF LAWS BY ADDING SECTION 11-35-5350 SO AS TO require A PUBLIC ENTITY ENTERING INTO A CONTRACT FOR A PUBLIC WORKS PROJECT OR FOR THE PURCHASE OF MATERIALS FOR A PUBLIC WORKS PROJECT MUST INCLUDE IN THE CONTRACT A REQUIREMENT THAT ANY IRON OR STEEL PRODUCT PERMANENTLY INCORPORATED IN THE PROJECT BE PRODUCED IN THE UNITED STATES, and to provide exceptions. Be it enacted by the General Assembly of the State of South Carolina: SECTION 1. Article 23, Chapter 35, Title 11 of the S.C. Code is amended by adding: Section 11-35-5350. (A) As used in this section: (1) "Head of the public procurement unit" means the individual with ultimate responsibility for the administration and operations of the state or local public procurement unit, as applicable. (2) "Iron or steel product" means any product made primarily of iron or steel including, but not limited to, lined or unlined pipes and fittings; bars and rods; wire, wire ropes, and link chains; forgings; grating and drainage products; access covers, hatches, manhole covers, and other castings; hydrants; electric transmission and distribution poles; tanks; flanges; pipe clamps and restraints; valves; structural steel and other steel mill products; materials made primarily of iron and steel within precast concrete; and other construction materials made primarily of iron or steel. (3) "Made primarily of iron or steel" means composed primarily of greater than fifty percent iron or steel measured by component cost, volume, or weight. (4) "Manufacturing process" means the application of a process to alter the form or function of materials or elements of a product in a manner that adds value and transforms the materials or elements into a new finished product functionally different from a finished product produced merely from assembling materials or elements into a product without applying such a process. (5) "Produced in the United States" means that, with respect to iron and steel, all manufacturing processes, from initial melting through application of coatings, occur in the United States, other than metallurgical processes to refine steel additives. (6) "Public entity" means the State, or any political subdivision of the State, including a school district or agency, department, institution, or other public entity of them. (7) "Public works project" subject to the requirements of this section and notwithstanding the provisions of Section 11-35-710(A)(1) to the contrary, means an activity paid for with any state-appropriated funds or state funds administered by a public entity which consists of the construction, maintenance, renovation, remodeling, or improvement of a building, road, street, sewer, storm drain, water system, site development, irrigation system, reclamation project, gas or electrical distribution system, gas or electrical substation, or other facility, project, or portion owned in whole or in part by any public entity. For purposes of this section, repairs undertaken in response to an emergent situation affecting public health, safety, or property are excluded from this definition. (B)(1) Except as provided otherwise in this section, a public entity entering into a contract for a public works project or for the purchase of materials for a public works project must include in the contract a requirement that any iron or steel product permanently incorporated in the project be produced in the United States. (2) Item (1) does not apply if the head of the public procurement unit of the public entity administering the funds for a public works project or the purchase of materials for a public works project solely determines that any of the following applies: (a) Iron or steel products produced in the United States are not produced in sufficient quantities, reasonably available, or of satisfactory quality. (b) The use of iron or steel products produced in the United States will increase the total cost of the project by more than twenty-five percent. (c) Complying with item (1) is inconsistent with the public interest. (3) Notwithstanding item (1), the following exceptions shall apply: (a) When steel and iron materials are used in a public works project, item (1) does not prevent a minimal use of foreign steel and iron materials if: (i) such materials are inci
View South Carolina H 4709 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.