North Carolina SB 1003: Permit Time Lines/Certain Wastewater Systems.
Status: Passed 1st Reading (as of 2026-05-04)
State: North Carolina · Session: 2025 · Bill: SB 1003
Subjects: APPROPRIATIONS; BUDGETING; COMMISSIONS; CONSTRUCTION; DEQ; ENVIRONMENT; ENVIRONMENTAL MANAGEMENT COMN.; INFRASTRUCTURE; LICENSES & PERMITS; PUBLIC; UTILITIES; WATER & SEWER SYSTEMS
Sponsors: Measmer
Bill Text
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 S 1 SENATE BILL 1003 Short Title: Permit Time Lines/Certain Wastewater Systems. (Public) Sponsors: Senator Measmer (Primary Sponsor). Referred to: Rules and Operations of the Senate May 4, 2026 *S1003-v-1* A BILL TO BE ENTITLED 1 AN ACT TO ESTABLISH PERMITTING DEADLINES FOR NPDES PERMITS TO BE 2 ISSUED FOR NEW OR EXPANDED WASTEWATER TREATMENT SYSTEMS TO BE 3 LOCATED IN FAST GROWING COUNTIES AND TO APPROPRIATE FUNDS TO THE 4 DEPARTMENT OF ENVIRONMENTAL QUALITY TO IMPLEMENT THE 5 EXPEDITED PERMITTING REQUIREMENTS. 6 The General Assembly of North Carolina enacts: 7 SECTION 1. G.S. 143-215.1 is amended by adding a new subsection to read: 8 "(f6) With respect to permits for new or expanded wastewater treatment systems to be 9 located in a county with a projected population growth rate above two percent (2%) annually or 10 is located in one of the top twenty percent (20%) of the fastest growing counties in the State, by 11 population, permitting under the authority granted to the Commission by this section shall 12 comply with the procedures and time lines set forth in this subsection. The Commission shall act 13 on a permit application as quickly as possible. The following provisions apply: 14 (1) The Commission shall perform an administrative review of a new application 15 and of a resubmittal of an application determined to be incomplete under 16 subdivision (2) of this subsection within 30 working days of receipt to 17 determine if the information is administratively complete. If complete, the 18 Commission shall issue a receipt letter or electronic response stating that the 19 application is complete and that a 90-calendar day technical review period has 20 started as of the original date the application was received. If required items 21 or information are not included, the application shall be deemed incomplete 22 and the Commission shall issue an application receipt letter or electronic 23 response identifying the information required to complete the application 24 package before the technical review begins. When the required information is 25 received, the Commission shall then issue a receipt letter or electronic 26 response specifying that it is complete and that the 90-calendar day review 27 period has started as of the date of receipt of all required information. The 28 Commission shall develop an application package checklist identifying the 29 items and information required for an application to be considered 30 administratively complete. After issuing a letter or electronic response 31 requesting additional information based on the original submittal under this 32 subdivision, the Commission shall not subsequently request additional 33 information that was not previously identified as missing or required in that 34 additional information letter or electronic response from the original 35 submittal. The Commission may, however, respond to subsequent additional 36 General Assembly Of North Carolina Session 2025 Page 2 Senate Bill 1003-First Edition information letters or electronic responses with a request for additional 1 information limited to information missing from that subsequent additional 2 information letter or electronic response. 3 (2) If, during the 90-calendar day technical review period, the Commission 4 determines that additional information is required to continue processing the 5 application, the Commission and the applicant shall comply with the 6 following: 7 a. The Commission shall issue a letter or electronic response with a list 8 of the additional information required to issue the permit. 9 b. The applicant shall have 30 calendar days from the date the letter or 10 electronic response is sent to submit the additional information to the 11 Commission. 12 c. If the applicant fails to provide the required information within 30 13 calendar days, the Commission shall return the application to the 14 applicant, the application is deemed denied, and the applicant must 15 resubmit a complete application with a new application fee before the 16 project may be reviewed. 17 d. Upon receipt of the required information from the applicant, the 18 Commission shall have 30 calendar days to complete the technical 19 review and issue the permit, issue the permit with modifications, deny 20 the permit, or issue a letter or electronic response with a list of 21 additional information required to continue processing the application, 22 and the review process will proceed in accordance with 23 sub-subdivision b. of this subdivision. 24 e. After issuing a letter or electronic response requesting additional 25 information under this subdivision, the Commission shall not 26 subsequently request additional information that was not previously 27 identified as missing or required in that additional information letter 28 or electronic response. The Commission may request additional 29 information if required for the technical review based on any new 30 inf
View North Carolina SB 1003 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.