Pennsylvania SB 1019: An Act amending the act of November 30, 2004 (P.L.1672, No.213), known as the Alternative Energy Portfolio Standards Act, further providing for definitions, for interconnection standards for customer-generator facilities and for interagency responsibilities.
Status: Referred to Consumer Protection & Professional Licensure (as of 2025-12-10)
State: Pennsylvania · Session: 2025-2026 · Bill: SB 1019
Sponsors: Lisa Boscola, Art Haywood, Carolyn Comitta, Devlin Robinson, Elder Vogel, Judith Schwank, Marty Flynn, Nick Miller, Nick Pisciottano, Patty Kim, Scott Hutchinson
Bill Text
PRINTER'S NO. 1354 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. 1019 Session of 2025 INTRODUCED BY BOSCOLA, KIM, HAYWOOD, VOGEL, HUTCHINSON, ROBINSON, FLYNN AND MILLER, DECEMBER 10, 2025 REFERRED TO CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, DECEMBER 10, 2025 AN ACT Amending the act of November 30, 2004 (P.L.1672, No.213), entitled "An act providing for the sale of electric energy generated from renewable and environmentally beneficial sources, for the acquisition of electric energy generated from renewable and environmentally beneficial sources by electric distribution and supply companies and for the powers and duties of the Pennsylvania Public Utility Commission," further providing for definitions, for interconnection standards for customer-generator facilities and for interagency responsibilities. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. The definitions of "customer-generator" and "net metering" in section 2 of the act of November 30, 2004 (P.L.1672, No.213), known as the Alternative Energy Portfolio Standards Act, are amended and the section is amended by adding definitions to read: Section 2. Definitions. The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 "Abandoned mine land." An area of land no longer in use that, in connection with extracting a natural resource from its natural deposits in the earth by any means, has had material placed upon, under or above the surface. * * * "Avoided cost." The average locational marginal price of energy, capacity and transmission and distribution grid services values, as determined by the commission, in the applicable transmission zone over the customer-generator's billing period. "Brownfield." A property the expansion, redevelopment or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant or contaminant. "Capped landfill." A capped facility for disposal of trash or garbage in which waste is buried between layers of earth and covered by a cap. * * * "Corporation." A body corporate, joint-stock company or association, domestic or foreign, and the body corporate's, joint-stock company's or association's lessee, assignee, trustee, receiver or other successor in interest that has a power or privilege of a corporation not possessed by an individual or partnership. The term does not include a municipal corporation, except as otherwise expressly provided in this act, or a bona fide cooperative association that furnishes service on a nonprofit basis only to the association's stockholders or members. * * * "Customer-generator." A [nonutility owner or operator of a net metered distributed generation system with] retail electric customer that is a nonutility that owns and operates, leases or 20250SB1019PN1354 - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 operates or contracts with a third party that owns or operates an alternative energy system that meets all of the following criteria: (1) Has a nameplate capacity of not greater than 50 kilowatts if installed at a residential service or not larger than 3,000 kilowatts at other customer service locations, except for customers whose systems are above three megawatts and up to five megawatts who make their systems available to operate in parallel with the electric utility during grid emergencies as defined by the regional transmission organization or where a microgrid is in place for the primary or secondary purpose of maintaining critical infrastructure, such as homeland security assignments, emergency services facilities, hospitals, traffic signals, wastewater treatment plants or telecommunications facilities, provided that technical rules for operating generators interconnected with facilities of an electric distribution company, electric cooperative or municipal electric system have been promulgated by the Institute of Electrical and Electronic Engineers and the Pennsylvania Public Utility Commission. (2) Has electric load, independent of the alternative energy system, behind the meter and the point of interconnection of the alternative energy system. To be independent of the alternative energy system, the electric load must have a purpose other than to support operation, maintenance or administration of the alternative energy system. (3) Is sized so the alternative energy system will generate not more than the customer-generator's annual electric consumption at the interconnection meter location 20250SB1019PN1354 - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 when combined with all qualifying virtual meter aggregation locations as of the interconnection application date. The following shall apply: (i) For existing service location accounts, annual electric consumpti
View Pennsylvania SB 1019 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.