Missouri SB 369: Modifies certain provisions relating to solar energy systems
Status: Second Read and Referred S Commerce, Consumer Protection, Energy & the Environment Committee (as of 2025-02-17)
State: Missouri · Session: 2025 · Bill: SB 369
Sponsors: Brattin
Bill Text
EXPLANATION-Matter enclosed in bold-faced brackets [thus] in this bill is not enacted and is intended to be omitted in the law. FIRST REGULAR SESSION SENATE BILL NO. 369 103RD GENERAL ASSEMBLY INTRODUCED BY SENATOR BRATTIN. 1428S.01I KRISTINA MARTIN, Secretary AN ACT To repeal sections 386.890 and 442.404, RSMo, and to enact in lieu thereof two new sections relating to solar energy systems. Be it enacted by the General Assembly of the State of Missouri, as follows: Section A. Sections 386.890 and 442.404, RSMo, are 1 repealed and two new sections enacted in lieu thereof, to be 2 known as sections 386.890 and 442.404, to read as follows:3 386.890. 1. This section shall be known and may be 1 cited as the "Net Metering and Easy Connection Act". 2 2. As used in this section, the following terms shall 3 mean: 4 (1) ["Avoided fuel cost", the current average cost of 5 fuel for the entity generating electricity, as defined by 6 the governing body with jurisdiction over any municipal 7 electric utility, rural electric cooperative as provided in 8 chapter 394, or electrical corporation as provided in this 9 chapter; 10 (2)] "Commission", the public service commission of 11 the state of Missouri; 12 [(3)] (2) "Customer-generator", the owner or operator 13 of a qualified electric energy generation unit which: 14 (a) Is powered by a renewable energy resource; 15 (b) Has an electrical generating system with a 16 capacity of not more than one [hundred] thousand kilowatts; 17 SB 369 2 (c) Is located on a premises owned, operated, leased, 18 or otherwise controlled by the customer-generator or utility 19 service territory through virtual net metering; 20 (d) Is interconnected and operates in parallel phase 21 and synchronization with a retail electric supplier and has 22 been approved by said retail electric supplier or public 23 service commission regulation; 24 (e) Is intended primarily to offset part or all of the 25 customer-generator's [own] current or future electrical 26 energy requirements; 27 (f) Meets [all applicable safety, performance, 28 interconnection, and reliability standards established by 29 the National Electrical Code, the National Electrical Safety 30 Code, the Institute of Electrical and Electronics Engineers, 31 Underwriters Laboratories, the Federal Energy Regulatory 32 Commission, and any local governing authorities] the 33 requirements of the uniformed solar permit and inspection 34 form promulgated by the commission; and 35 (g) Contains a mechanism that automatically disables 36 the unit and interrupts the flow of electricity back onto 37 the supplier's electricity lines in the event that service 38 to the customer-generator is interrupted; 39 [(4)] (3) "Department", the department of natural 40 resources; 41 [(5)] (4) "Net metering", using metering equipment 42 sufficient to measure the difference between the electrical 43 energy supplied to a customer-generator by a retail electric 44 supplier and the electrical energy supplied by the customer- 45 generator to the retail electric supplier over the 46 applicable billing period; 47 [(6)] (5) "Renewable energy resources", electrical 48 energy produced from wind, solar thermal sources, 49 SB 369 3 hydroelectric sources, photovoltaic cells and panels, fuel 50 cells using hydrogen produced by one of the above-named 51 electrical energy sources, and other sources of energy that 52 become available after August 28, 2007, and are certified as 53 renewable by the department; 54 (6) "Retail electric rate", the tariff that the 55 customer would be assigned if the customer were not an 56 eligible customer-generator; 57 (7) "Retail electric supplier" or "supplier", any 58 municipally owned electric utility operating under chapter 59 91, electrical corporation regulated by the commission under 60 this chapter, or rural electric cooperative operating under 61 chapter 394 that provides retail electric service in this 62 state. An electrical corporation that operates under a 63 cooperative business plan as described in subsection 2 of 64 section 393.110 shall be deemed to be a rural electric 65 cooperative for purposes of this section. 66 3. A retail electric supplier shall: 67 (1) Make net metering available to customer-generators 68 on a first-come, first-served basis until the total rated 69 generating capacity of net metering systems equals [five] 70 fifteen percent of the retail electric supplier's single- 71 hour peak load during the previous year, after which the 72 commission for an electrical corporation or the respective 73 governing body of other retail electric suppliers may 74 increase the total rated generating capacity of net metering 75 systems to an amount above [five] fifteen percent. However, 76 in a given calendar year, no retail electric supplier shall 77 be required to approve any application for interconnection 78 if the total rated generating capacity of all applications 79 for interconnection already approved to date by said 80 suppli
View Missouri SB 369 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.