Washington HB 1819: Increasing transmission capacity.
Status: House Rules "X" file. (as of 2026-02-19)
State: Washington · Session: 2025-2026 · Bill: HB 1819
Sponsors: Barnard, Doglio, Fitzgibbon, Parshley, Ramel
Bill Text
AN ACT Relating to increasing transmission capacity; amending RCW 1 19.280.030; adding a new section to chapter 80.28 RCW; adding a new 2 section to chapter 43.21C RCW; and creating a new section.3 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:4 Sec. 1. RCW 19.280.030 and 2024 c 351 s 9 are each amended to 5 read as follows:6 Each electric utility must develop a plan consistent with this 7 section.8 (1) Utilities with more than 25,000 customers that are not full 9 requirements customers must develop or update an integrated resource 10 plan by September 1, 2008. At a minimum, progress reports reflecting 11 changing conditions and the progress of the integrated resource plan 12 must be produced every two years thereafter. An updated integrated 13 resource plan must be developed at least every four years subsequent 14 to the 2008 integrated resource plan. The integrated resource plan, 15 at a minimum, must include:16 (a) A range of forecasts, for at least the next 10 years or 17 longer, of projected customer demand which takes into account 18 econometric data and customer usage;19 (b) An assessment of commercially available conservation and 20 efficiency resources, as informed, as applicable, by the assessment 21 H-0383.3 HOUSE BILL 1819 State of Washington 69th Legislature 2025 Regular Session By Representatives Barnard, Doglio, Parshley, Ramel, and Fitzgibbon Read first time 02/04/25. Referred to Committee on Environment & Energy. p. 1 HB 1819 for conservation potential under RCW 19.285.040 for the planning 1 horizon consistent with (a) of this subsection. Such assessment may 2 include, as appropriate, opportunities for development of combined 3 heat and power as an energy and capacity resource, demand response 4 and load management programs, and currently employed and new policies 5 and programs needed to obtain the conservation and efficiency 6 resources;7 (c) An assessment of commercially available, utility scale 8 renewable and nonrenewable generating technologies including a 9 comparison of the benefits and risks of purchasing power or building 10 new resources;11 (d) A comparative evaluation of renewable and nonrenewable 12 generating resources, including transmission and distribution 13 delivery costs, and conservation and efficiency resources using 14 "lowest reasonable cost" as a criterion;15 (e) An assessment of methods, commercially available 16 technologies, or facilities for integrating renewable resources, 17 including but not limited to battery storage and pumped storage, and 18 addressing overgeneration events, if applicable to the utility's 19 resource portfolio;20 (f) An assessment and 20-year forecast of the availability of and 21 requirements for regional generation and transmission capacity to 22 provide and deliver electricity to the utility's customers and to 23 meet the requirements of chapter 288, Laws of 2019 and the state's 24 greenhouse gas emissions reduction limits in RCW 70A.45.020. The 25 transmission assessment must identify the utility's expected needs to 26 acquire new long-term firm rights, develop new, or expand or upgrade 27 existing, bulk transmission facilities consistent with the 28 requirements of this section and reliability standards;29 (i) If an electric utility operates transmission assets rated at 30 115,000 volts or greater, the transmission assessment must take into 31 account opportunities to make more effective use of existing 32 transmission capacity through improved transmission system operating 33 practices, energy efficiency, demand response, grid modernization, 34 nonwires solutions, and other programs if applicable. The 35 transmission assessment for such an electric utility must examine 36 which of the utility's transmission lines can be reconductored with 37 advanced conductors;38 (ii) An electric utility that relies entirely or primarily on a 39 contract for transmission service to provide necessary transmission 40 p. 2 HB 1819 services may comply with the transmission requirements of this 1 subsection by requesting that the counterparty to the transmission 2 service contract include the provisions of chapter 288, Laws of 2019 3 and chapter 70A.45 RCW as public policy mandates in the transmission 4 service provider's process for assessing transmission need, and 5 planning and acquiring necessary transmission capacity;6 (iii) An electric utility may comply with the requirements of 7 this subsection (1)(f) by relying on and incorporating the results of 8 a separate transmission assessment process, conducted individually or 9 jointly with other utilities and transmission system users, if that 10 assessment process meets the requirements of this subsection;11 (g) A determination of resource adequacy metrics for the resource 12 plan consistent with the forecasts;13 (h) A forecast of distributed energy resources that may be 14 installed by the utility's customers and an assessment of their 15 effect on the utility's load and operations;16
View Washington HB 1819 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.