Pennsylvania HB 611: An Act amending the act of November 10, 1999 (P.L.491, No.45), known as the Pennsylvania Construction Code Act, providing for deconstruction standards; and imposing penalties.
Status: Referred to Housing & Community Development (as of 2025-02-20)
State: Pennsylvania · Session: 2025-2026 · Bill: HB 611
Sponsors: Marylouise Isaacson, Benjamin Sanchez, Carol Hill-Evans, Danielle Friel Otten, Danilo Burgos, G. Roni Green, Jose Giral, Joseph Hohenstein, Tarik Khan
Bill Text
PRINTER'S NO. 624 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. 611 Session of 2025 INTRODUCED BY ISAACSON, BURGOS, GIRAL, GREEN, HILL-EVANS, HOHENSTEIN, KHAN, OTTEN AND SANCHEZ, FEBRUARY 20, 2025 REFERRED TO COMMITTEE ON HOUSING AND COMMUNITY DEVELOPMENT, FEBRUARY 20, 2025 AN ACT Amending the act of November 10, 1999 (P.L.491, No.45), entitled "An act establishing a uniform construction code; imposing powers and duties on municipalities and the Department of Labor and Industry; providing for enforcement; imposing penalties; and making repeals," providing for deconstruction standards; and imposing penalties. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. The act of November 10, 1999 (P.L.491, No.45), known as the Pennsylvania Construction Code Act, is amended by adding a chapter to read: CHAPTER 8 DECONSTRUCTION STANDARDS Section 801. Definitions. The following words and phrases when used in this chapter shall have the meanings given to them in this section unless the context clearly indicates otherwise: "Certified deconstruction contractor." As follows: (1) A contractor that: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 (i) has successfully completed a deconstruction certification program conducted by the department; and (ii) appears on a list of certified deconstruction contractors posted on the publicly accessible Internet website of the department. (2) A firm or other entity shall be considered a certified deconstruction contractor if at least one individual currently employed by the firm or other entity is certified. "Deconstruction." The systematic dismantling of a structure, or portion of a structure, to maximize the salvage of materials for reuse, in preference over salvaging materials for recycling, energy recovery or sending the materials to a landfill. "Heavy machinery." Equipment used in the deconstruction or demolition of a building or structure such as track hoes, excavators, skid steer loaders and forklifts. "Primary dwelling structure." A residential building containing at least one but not more than four dwelling units based on current permitted occupancy at the time of the demolition permit application. The term does not include an accessory building such as a garage or shed. "Recycling." The processing of waste materials into new products or material feed stock for products. Materials that can be recycled include, but are not limited to, concrete, metal piping and asphalt roofing shingles. "Responsible party." Any of the following: (1) An owner or person in control of a primary dwelling structure. (2) An authorized agent of the owner or person described in paragraph (1). 20250HB0611PN0624 - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 "Reuse." The use of a product or material that was previously installed for the same or similar function to extend the life cycle of the product or material . Materials salvageable for reuse include, but are not limited to, cabinets, doors, windows, hardware, fixtures, flooring, siding and framing lumber. Section 802. Deconstruction assessment. Each primary dwelling structure in this Commonwealth that was erected prior to January 1, 1930, as indicated by municipal building records or, if no municipal building records exist, according to records of the county recorder of deeds in the county where the primary dwelling structure is located, and that meets the criteria established in this chapter shall undergo a deconstruction assessment prior to the demolition, renovation or other construction regarding the primary dwelling structure. Section 803. Deconstruction requirements. A primary dwelling structure shall be deconstructed in accordance with the provisions of this chapter and associated rules and regulations. The following apply: (1) Salvaged material may be sold, donated or reused on- site or off-site. (2) Each deconstruction project must achieve a documented 85% landfill diversion rate by weight and produce one salvaged item for every 500 square meters of design unless otherwise approved by the municipal code official in writing for the particular structure, based on economic or practical infeasibility as determined by the municipal code official after consideration and inspection. (3) Deconstruction under this chapter shall be performed only by a certified deconstruction professional certified and 20250HB0611PN0624 - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 designated by the department under section 804. Section 804. Powers and duties of department. (a) Mandatory actions.--The department shall: (1) Administer the provisions of this chapter. (2) Adopt rules, procedures and forms to implement the provisions of this chapter. (3) Post the rules, procedures and forms to implement this chapter on the publicly accessible Internet website of the department. (4) With respect to deconstruction certification training: (i) De
View Pennsylvania HB 611 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.