Virginia HB 920: Electric utilities; development of offshore wind capacity.
Status: Left in Labor and Commerce (as of 2026-02-18)
State: Virginia · Session: 2026 · Bill: HB 920
Sponsors: Alfonso H. Lopez
Bill Text
2026 SESSION INTRODUCED 26102201D HOUSE BILL NO. 920 Offered January 14, 2026 Prefiled January 13, 2026 A BILL to amend and reenact §§ 56-585.1:11 and 56-585.5 of the Code of Virginia, relating to electric utilities; development of offshore wind capacity. ————— Patron—Lopez ————— Referred to Committee on Labor and Commerce ————— Be it enacted by the General Assembly of Virginia: 1. That §§ 56-585.1:11 and 56-585.5 of the Code of Virginia are amended and reenacted as follows: § 56-585.1:11. Development of offshore wind capacity. A. As used in this section: "Advanced clean energy buyer" means a commercial or industrial customer of a Phase II Utility, irrespective of generation supplier, (i) with an aggregate load over 100 megawatts; (ii) with an aggregate amount of at least 200 megawatts of solar or wind energy supply under contract with a term of 10 years or more from facilities located within the Commonwealth by January 1, 2024; and (iii) that directly procures from the utility the electric supply and environmental attributes of the offshore wind facility associated with the lesser of 50 megawatts of nameplate capacity or 15 percent of the commercial or industrial customer's annual peak demand for a contract period of 15 years. "Aggregate load" means the combined electrical load associated with selected accounts of an advanced clean energy buyer with the same legal entity name as, or in the names of affiliated entities that control, are controlled by, or are under common control of, such legal entity or are the names of affiliated entities under a common parent. "Control" means the legal right, directly or indirectly, to direct or cause the direction of the management, actions, or policies of an affiliated entity, whether through the ability to exercise voting power, by contract, or otherwise. "Control" does not include control of an entity through a franchise or similar contractual agreement. "Offshore wind affiliate" means a regulated affiliate company of a Phase II Utility subject to the Commission's jurisdiction established by such utility in connection with any project constructed pursuant to subdivision C 1 for the purpose of securing a noncontrolling equity financing partner for the project. "Qualifying large general service customer" means a customer of a Phase II Utility, irrespective of general supplier, (i) whose peak demand during the most recent calendar year exceeded five megawatts and (ii) that contracts with the utility to directly procure electric supply and environmental attributes associated with the offshore wind facility in amounts commensurate with the customer's electric usage for a contract period of 15 years or more. "Wind turbine generator" means a structure composed of a tower, a rotor with blades connected at the hub, and nacelle and ancillary electrical and other equipment that is affixed to a foundation of which multiple structures comprise a generating facility. B. In order to meet the Commonwealth's clean energy goals, prior to December 31, 2032 2030, the construction or purchase by a public utility of one or more offshore wind generation facilities located off the Commonwealth's Atlantic shoreline or in federal waters and interconnected directly into the Commonwealth, with an aggregate capacity of up to 5,200 25,000 megawatts, is in the public interest and the Commission shall so find, provided that no customers of the utility shall be responsible for costs of any such facility in a proportion greater than the utility's ownership share of the facility, including any ownership share held by an offshore wind affiliate. C. 1. Pursuant to subsection B, construction by a Phase II Utility of one or more new utility-owned and utility-operated generating facilities utilizing energy derived from offshore wind and located off the Commonwealth's Atlantic shoreline, with an aggregate rated capacity of not less than 2,500 megawatts and not more than 3,000 megawatts, along with electrical transmission or distribution facilities associated therewith for interconnection is in the public interest. In acting upon any request for cost recovery by a Phase II Utility or its offshore wind affiliate for costs associated with such a facility, the Commission shall determine the reasonableness and prudence of any such costs, provided that such costs shall be presumed to be reasonably and prudently incurred if the Commission determines that (i) the utility has complied with the competitive solicitation and procurement requirements pursuant to subsection E; (ii) the project's projected total levelized cost of energy, including any tax credit, on a cost per megawatt hour basis, inclusive of the costs of transmission and distribution facilities associated with the facility's interconnection, does not exceed 1.4 times the comparable cost, on an unweighted average basis, of a conventional simple cycle combustion turbine generating facility as estimated by the U.S. Energy Information
View Virginia HB 920 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.