Iowa HF 2283: A bill for an act relating to the expiration date of a license issued by the board of educational examiners. (Formerly HSB 562.) Effective 7-1-18.

Status: Signed by Governor. (as of 2018-03-21)

State: Iowa · Session: 2017-2018 · Bill: HF 2283

Subjects: education, educational examiners board, professional licensure, professions, school administrators, teachers

Bill Text

House
File
2283
-
Introduced

HOUSE
FILE
2283

BY
THOMSON

A
BILL
FOR

An
Act
relating
to
grid-enhancing
technologies
and
1

reconductoring,
including
study
and
reporting
requirements.
2

BE
IT
ENACTED
BY
THE
GENERAL
ASSEMBLY
OF
THE
STATE
OF
IOWA:
3

TLSB
6805HH
(3)
91

sb/js

H.F.
2283

Section
1.
NEW
SECTION
.
478.34
Grid-enhancing
technologies
1

and
reconductoring.
2

1.
For
purposes
of
this
section:
3

a.
“Capacity”
means
the
maximum
amount
of
electricity
that
4

can
flow
through
a
transmission
line
while
observing
industry
5

safety
standards.
6

b.
“Congestion”
means
a
condition
in
which
a
lack
of
7

transmission
line
capacity
prevents
the
delivery
of
the
8

lowest-cost
electricity
dispatched
to
meet
the
load
demand
at
a
9

specific
location.
10

c.
“Dynamic
line
rating
system”
means
hardware
or
software
11

used
to
calculate
the
thermal
limit
of
existing
electric
12

transmission
lines
at
a
specific
point
in
time
by
incorporating
13

information
on
real-time
and
forecasted
weather
conditions.
14

d.
“Grid-enhancing
technology”
means
hardware
and
software
15

that
increases
the
capacity
of
electrical
lines
and
improves
16

the
congestion,
efficiency,
reliability,
and
safety
of
the
17

grid.
“Grid-enhancing
technology”
includes
but
is
not
limited
18

to
a
dynamic
line
rating
system,
an
advanced
power
flow
control
19

system,
or
topology
optimization.
20

e.
“Power
flow
control
system”
means
hardware
and
21

software
used
to
reroute
electricity
from
overloaded
electric
22

transmission
lines
to
underutilized
electric
transmission
23

lines.
24

f.
“Reconductored
with
an
advanced
conductor”
means
replacing
25

the
existing
electric
conductor
with
a
conductor
that
has
a
26

direct
current
electrical
resistance
not
less
than
ten
percent
27

lower
than
existing
conductors
of
a
similar
diameter
on
the
28

system
and
may
include
rebuilding
support
structures
or
other
29

associated
facilities.

30

g.
“Thermal
limit”
means
the
temperature
an
electric
31

transmission
line
reaches
when
heat
from
the
electric
current

32

flow
within
the
electric
transmission
line
causes
excessive

33

sagging
of
the
electric
transmission
line.
34

h.
“Topology
optimization”
means
a
software
technology
35

-1-

LSB
6805HH
(3)
91

sb/js

1/
4

H.F.
2283

that
uses
mathematical
models
to
identify
reconfigurations
1

in
the
transmission
grid
in
order
to
reroute
electricity
2

from
overloaded
electric
transmission
lines
to
underutilized
3

electric
transmission
lines.
4

2.
a.
On
or
before
January
1,
2027,
and
every
three
years
5

thereafter,
each
public
utility
or
transmission
company
that
6

owns
or
operates
an
electric
transmission
line
in
Iowa
shall
7

prepare
and
submit
a
study
of
the
feasibility
of
projects
8

using
grid-enhancing
technologies
and
identifying
which
of
9

its
transmission
lines
can
be
reconductored
with
an
advanced
10

conductor
to
achieve
one
or
more
of
the
purposes
listed
in
11

paragraph
“c”
.
12

b.
The
study
shall
provide
information
on
feasibility,
cost,
13

rating,
implementation
time,
and
any
other
information
deemed
14

relevant
by
the
utilities
commission
and
be
submitted
to
the
15

commission
in
a
public
filing.
16

c.
The
study
required
under
paragraph
“a”
shall
be
designed
17

to
identify
projects
that
can
use
grid-enhancing
technologies
18

or
reconductoring
with
an
advanced
conductor
to
achieve
one
or
19

more
of
the
following
purposes:
20

(1)
Increase
transmission
capacity.
21

(2)
Reduce
transmission
system
congestion.
22

(3)
Reduce
curtailment
of
or
increase
capacity
to
connect
23

renewable
and
zero-carbon
resources.
24

(4)
Increase
reliability.
25

(5)
Reduce
potential
siting
conflicts
or
land
impacts
from
26

the
development
of
new
electric
transmission
lines.
27

(6)
Increase
flexibility
to
reduce
risks
surrounding
28

technology
and
permitting
uncertainties
in
statewide
electrical
29

system
planning
and
improve
optionality
for
load-serving
30

entities.
31

(7)
Reduce
line
losses.
32

(8)
Increase
the
ability
to
quickly
energize
new
customers
33

or
serve
increased
customer
load.

34

3.
This
section
does
not
apply
to
a
municipal
utility,
a
35

-2-

LSB
6805HH
(3)
91

sb/js

2/
4

H.F.
2283

cooperative
electric
association,
or
a
company
or
organization
1

that
owns
a
transmission
line
that
serves
a
single
customer
or
2

interconnects
a
single
electric
generating
facility.
3

4.
To
meet
the
requirements
of
this
section,
reporting
4

parties
may
rely
on
available
information
and
analysis
5

developed
by
a
regional
transmission
organization
or
any
6

subgroup
of
a
regional
transmission
organization
and
may
7

develop
and
include
additional
information
as
necessary.
8

EXPLANATION
9

The
inclusion
of
this
explanation
does
not
constitute
agreement
with
10

the
explanation’s
substance
by
the
members
of
the
general
assembly.
11

This
bill
relates
to
grid-enhancing
technologies
and
12

reconductoring.
The
bill
defines
terms
related
to
electric
13

transmission
capacity,
congestion,
and
gri

View Iowa HF 2283 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.