South Carolina S 878: Third-Party Electric Supplier
Status: Scrivener's error corrected (as of 2026-02-04)
State: South Carolina · Session: 2025-2026 · Bill: S 878
Sponsors: Adams, Climer, Johnson
Bill Text
2025-2026 Bill 878 Text of Previous Version (Feb. 04, 2026) - South Carolina Legislature Online
South Carolina General Assembly
126th Session, 2025-2026
Bill 878
Indicates Matter Stricken
Indicates New Matter
(Text matches printed bills. Document has been reformatted to meet World Wide Web specifications.)
A bill
TO AMEND THE SOUTH CAROLINA CODE OF LAWS BY ADDING CHAPTER
32 TO TITLE 58 SO AS TO DEFINE TERMS RELATED TO THIRD-PARTY ELECTRIC CHOICE; TO
ALLOW AN ELIGIBLE CUSTOMER TO PERMIT ITS ELECTRICITY DEMAND FROM A THIRD-PARTY
ELECTRIC SUPPLIER; TO REQUIRE THE ELIGIBLE CUSTOMER TO PROVIDE ARRANGEMENT FOR
FIRM TRANSMISSION SERVICE OF THIRD-PARTY ELECTRIC TO THE INCUMBENT ELECTRIC
SUPPLIER'S TRANSMISSION SYSTEM; TO NOT HOLD THE INCUMBENT ELECTRIC SUPPLIER
LIABLE FOR ANY COSTS ASSOCIATED WITH THIRD-PARTY ELECTRIC SUPPLY; TO REQUIRE
THE INCUMBENT ELECTRIC SUPPLIER TO HAVE REMOTE CUTOFF CAPABILITIES IN PLACE FOR
THIRD-PARTY ELECTRIC SUPPLY; TO ASSIGN THE COST OF REQUIRED TRANSMISSION
UPGRADES; TO REQUIRE A CUSTOMER TO CONTINUE TO PAY FOR CAPITAL COSTS IN CERTAIN
CIRCUMSTANCES; TO REQUIRE AN INCUMBENT ELECTRIC SUPPLIER TO PROVIDE
COST-OF-SERVICE SUPPLY TO CUSTOMERS OR CUSTOMER LOAD RETURNING FROM A PERIOD OF
RETAIL ACCESS SERVICE ON THE SAME TERMS, RATES, AND PRIORITY AS A NEW CUSTOMER
REQUESTING SERVICE; AND TO REQUIRE THE COMMISSION TO APPROVE A TARIFF
CONTAINING A PRO FORMA CONTRACT AND OTHER REQUIREMENTS.
Be it enacted by the
General Assembly of the State of South Carolina:
SECTION 1. Title 58 of the S.C. Code is amended by adding:
CHAPTER 32
Third-Party Electric Suppliers
Section
58-32-10. For the purposes of this chapter:
(1)
"Commission" means the Public Service Commission.
(2) "Customer-sited
generation" means an electric generation facility, or combination of electric
generation facilities, located on an eligible customer's premises and on the
eligible customer's side of the delivery point with a nameplate capacity that
does not exceed the eligible customer's estimated maximum demand for electric
service and that is solely for the use of the eligible customer. For purposes
of this chapter, an owner of customer-sited generation shall not be considered
an electrical utility as defined in Section 58-27-10(7).
(3)
"Customer-supplied power" means electric power and energy produced by
customer-sited generation or delivered to an eligible customer's delivery point
from a third-party electric supplier, or both.
(4)
"Delivery Point" means the point where the facilities of the incumbent electric
supplier make physical contact with the facilities of the eligible customer.
(5) "Distribution
services" means electric distributions services, along with any other services
required to safely and reliably deliver electric energy.
(6)
"Distribution tariff" means the tariff filed with the commission or the rules
otherwise governing electric distribution services provided by an incumbent
electric supplier.
(7) "Electric
generation facility" means a facility for generating electric power, including
renewable electric generation facilities and generation facilities qualifying
under the Public Utility Regulatory Policies Act of 1978 ("PURPA"), Public Law
95-617, as amended.
(8) "Electric
power" means electric energy, electric capacity, or generation-related
ancillary services or any combination thereof.
(9) "Electric
supplier" shall have the same meaning as in Section 58-27-610(1) and shall
include the South Carolina Public Service Authority.
(10) "Eligible
customer" means any retail electric customer located in the State of South
Carolina whose average monthly demand at a single point of delivery, or
aggregated multiple points of delivery that are owned, leased, or otherwise
controlled by such retail electric customer within that same utility territory,
for one month during of delivery during the most recent calendar year was equal
to or exceeded one hundred kilowatts (100kW), or the expansion of an existing
load by 100kW or more, or re-energizing an existing load or portion of a load
by 100kW or more that had been idled for at least twenty-four months, or the
interruptible portion of an existing load of 100kW or more, or in the event of
a new retail electric customer, whose average monthly demand at a single point
of delivery is anticipated to equal or exceed 100kW during the customer's first
year of electric service.
(11) "Full-requirements
contract" is a contract whereby the eligible customer agrees to purchase from
an electric supplier all of their supply needs from or through the electric
supplier, regardless of quantity under contractual terms specific in this
contract.
(12) "Incumbent
electric supplier" means an electric supplier or other person or corporation
that, pursuant to Title 58, Chapter 27, Article 5, furnishes or has the right
to furnish electric service to the eligible customer's premises.
(13) "Premises"
meanView South Carolina S 878 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.