Vermont S 50: An act relating to the extension of the deadline of school district mergers required by the State Board of Education
Status: Read 1st time & referred to Committee on Education (as of 2019-01-23)
State: Vermont · Session: 2019-2020 · Bill: S 50
Sponsors: Randolph Brock, Anthony Pollina, Christopher Bray, Corey Parent, Jeanette White, John Rodgers, Joseph Benning, Less…, Rebecca Balint, Richard McCormack, Richard Westman, Robert Starr
Bill Text
No. 38 Page 1 of 7 2025 VT LEG #384100 v.1 No. 38. An act relating to increasing the size of solar net metering projects that qualify for expedited registration. (S.50) It is hereby enacted by the General Assembly of the State of Vermont: Sec. 1. 30 V.S.A. § 8010 is amended to read: § 8010. SELF-GENERATION AND NET METERING * * * (c) In accordance with this section, the Commission shall adopt and implement rules that govern the installation and operation of net metering systems. (1) The rules shall establish and maintain a net metering program that: * * * (G) accounts for changes over time in the cost of technology; and (H) allows a customer to retain ownership of the environmental attributes of energy generated by the customer’s net metering system and of any associated tradeable renewable energy credits or to transfer those attributes and credits to the interconnecting retail provider, and: (i) if the customer retains the attributes, reduces the value of the credit provided under this section for electricity generated by the customer’s net metering system by an appropriate amount; (ii) if the customer transfers the attributes to the interconnecting provider, requires the provider to retain them for application toward compliance with sections 8004 and 8005 of this title unless the provider has No. 38 Page 2 of 7 2025 VT LEG #384100 v.1 fewer than 75,000 customers, in which case the attributes do not need to be applied toward compliance obligations under sections 8004 and 8005 of this title; and (iii) if a retail electricity provider that is 100 percent renewable under subdivision 8005(b)(1) of this title does not retire the transferred attributes under sections 8004 and 8005 of this title, requires that the provider apply an equivalent amount of attributes from distributed renewable generation that qualifies under subdivision 8005(a)(2) of this title toward its compliance obligations under sections 8004 and 8005 of this title; and (I) allows a customer to change the customer’s decision to retain or transfer the attributes once in the 120-day period after the net metering system is commissioned. * * * (3) The rules shall establish standards and procedures governing application for and issuance or revocation of a certificate of public good for net metering systems under the provisions of section 248 of this title. In establishing these standards and procedures: * * * (F) This subdivision (F) applies to an application for a net metering system with a capacity that is greater than 15 25 kilowatts, unless the system is located on a new or existing structure the primary purpose of which is not the No. 38 Page 3 of 7 2025 VT LEG #384100 v.1 generation of electricity. With respect to such a system, the rules shall not waive or include provisions that are less stringent than each of the following: (i) the requirement of subdivision 248(a)(4)(C) of this title to provide a copy of the application to the Agencies of Agriculture, Food and Markets and of Natural Resources; the Department of Public Service; the Division for Historic Preservation; the municipal legislative body; and the municipal and regional planning commissions; and (ii) the requirements of subsection 248(f) (preapplication submittal) of this title. (G) The rules shall establish an expedited registration procedure for net metering systems of 25 kilowatts and less in size. * * * Sec. 1a. NET METERING RENEWABLE ENERGY CREDITS OWNERSHIP The Public Utility Commission (PUC) shall allow a customer who owns a net metering system that was commissioned between January 1, 2023 and July 1, 2025 to change the customer’s decision to retain the attributes once. The customer shall be allowed to transfer the attributes to the utility by submitting a request to the PUC by September 2, 2025. Sec. 2. RULEMAKING The Public Utility Commission shall update its Rule 5.100 to allow ground mounted photovoltaic net metering systems of 25 kilowatts and less to qualify No. 38 Page 4 of 7 2025 VT LEG #384100 v.1 for expedited registration. It is the intent of the General Assembly that the Commission shall allow systems of 25 kilowatts and less to use the expedited registration before the rules are updated. Sec. 3. 30 V.S.A. § 248(s) is amended to read: (s) This subsection sets minimum setback requirements that shall apply to in-state ground-mounted solar electric generation facilities approved under this section, unless the facility is installed on a canopy constructed on an area primarily used for parking vehicles that is in existence or permitted on the date the application for the facility is filed. (1) The minimum setbacks shall be: (A) From a State or municipal highway, measured from the edge of the traveled way: (i) 100 feet for a facility with a plant capacity exceeding 150 kW; and (ii) 40 feet for a facility with a plant capacity less than or equal to 150 kW but greater than 15 25 kW; and (iii) 10 feet for a facility with a plant capacity less than or equal to 25 kW.
View Vermont S 50 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.