Pennsylvania SB 1322: An Act providing for solar-ready projects involving a warehouse or distribution center; authorizing tax exemptions and special tax provisions; imposing duties on the Department of Environmental Protection; and imposing penalties.
Status: Referred to Environmental Resources & Energy (as of 2026-05-07)
State: Pennsylvania · Session: 2025-2026 · Bill: SB 1322
Sponsors: Nikil Saval, Amanda Cappelletti, Anthony Williams, Art Haywood, Carolyn Comitta, Elder Vogel, Jay Costa, John Kane, Lindsey Williams, Maria Collett, Timothy Kearney
Bill Text
PRINTER'S NO. 1707 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. 1322 Session of 2026 INTRODUCED BY SAVAL, COMITTA, COSTA, HAYWOOD, CAPPELLETTI, KEARNEY, VOGEL, L. WILLIAMS, KANE AND A. WILLIAMS, MAY 7, 2026 REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, MAY 7, 2026 AN ACT Providing for solar-ready projects involving a warehouse or distribution center; authorizing tax exemptions and special tax provisions; imposing duties on the Department of Environmental Protection; and imposing penalties. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Short title. This act shall be known and may be cited as the Solar-Ready Warehouse and Distribution Center Act. Section 2. Definitions. The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise: "Applicant." A person applying for a waiver from the solar- ready requirements under section 3. "Department." The Department of Environmental Protection of the Commonwealth. "Eligible project costs." Costs related to the purchase and 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 installation of equipment directly related to a retrofit project for a solar-ready warehouse or distribution center. "Large-scale warehouse or distribution center." A warehouse or distribution center with a floor area that is at least 100,000 square feet. "Local taxing authority." A county, city, borough, incorporated town, township, institution district or school district having authority to levy real property taxes. "Retrofit project." A project involving a change in design, construction or equipment already in operation in order to incorporate later improvements. "Solar-ready." With respect to a building, designed and constructed in a manner that facilitates and optimizes the installation of solar photovoltaic panels on the roof of the building or other areas of the building. "Warehouse or distribution center." As follows: (1) A building or group of buildings on the same lot used for the indoor storage of goods, products and materials or the receipt of bulk products and separation and distribution of those products to another warehouse or to individual end-user consumers. (2) The term includes value-added services between a supplier and its customers, such as breaking down of large orders from a single source into smaller orders, product mixing, sorting, packaging, cross-docking, order fulfillment, order returns or the consolidation of several orders into one large order for distribution to several recipients. Section 3. Solar-ready requirements. (a) Applicability.--This section applies to each large-scale warehouse or distribution center for which construction is 20260SB1322PN1707 - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 commenced on or after the effective date of this subsection. (b) Large-scale warehouse or distribution center.--Each large-scale warehouse or distribution center shall be solar- ready. (c) Design.--Solar-ready design shall include the following features: (1) A minimum of 40% of the roof area designated as suitable for solar photovoltaic installation, free from obstructions such as HVAC systems, vents or other equipment. (2) Structural integrity sufficient to support the installation of solar photovoltaic systems, accounting for the weight of panels, mounting systems and potential wind or snow loads. (3) Conduit pathways from the roof to the electrical room of the building to accommodate wiring for solar energy systems. (4) An appropriately sized space in the electrical room of the building for solar energy inverters and related equipment. Section 4. Waivers. (a) Grant of waiver request.--The department may grant to an applicant a waiver from the solar-ready requirements under section 3 only under the following conditions: (1) The applicant demonstrates that the physical characteristics of the site make compliance technically infeasible, including: (i) Shading from an adjacent building, terrain or vegetation that permanently obstructs sufficient solar access. (ii) Structural constraints specific to the building 20260SB1322PN1707 - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 site, such as poor soil conditions requiring extensive and cost-prohibitive engineering modifications. (2) The applicant demonstrates that the additional costs incurred to meet the requirements arise solely from the extraordinary site conditions or external factors beyond the typical scope of construction for a warehouse or distribution center and exceed a defined financial threshold, such as 10% of the total construction budget. (b) Denial or waiver request.--The following considerations shall not be grounds for a waiver under this section: (1) General compliance costs associated with meeting the solar-ready requirements under section 3. (2) The applicant's perceived market feasibi
View Pennsylvania SB 1322 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.