New Jersey S 1119: Directs BPU to study feasibility of adopting certain requirements for installation of new and replacement electric distribution utility poles and transmission towers.
Status: Introduced in the Senate, Referred to Senate Economic Growth Committee (as of 2024-01-09)
State: New Jersey · Session: 221 · Bill: S 1119
Subjects: PUBLIC UTIL
Sponsors: McKeon, John F.
Bill Text
SENATE, No. 1119 STATE OF NEW JERSEY 221st LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2024 SESSION Sponsored by: Senator JOHN F. MCKEON District 27 (Essex and Passaic) SYNOPSIS Directs BPU to study feasibility of adopting certain requirements for installation of new and replacement electric distribution utility poles and transmission towers. CURRENT VERSION OF TEXT Introduced Pending Technical Review by Legislative Counsel. S1119 MCKEON 2 AN ACT directing the Board of Public Utilities to conduct a study 1 concerning certain electric public utility infrastructure. 2 3 BE IT ENACTED by the Senate and General Assembly of the State 4 of New Jersey: 5 6 1. a. The Board of Public Utilities shall study and prepare and 7 submit, within six months of the effective date of P.L. , c. (C. ) 8 (pending before the Legislature as this bill), to the Governor and, 9 pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), to the 10 Legislature a written report which shall make findings and 11 recommendations concerning the feasibility of establishing 12 requirements concerning the installation of new or replacement 13 electric distribution utility poles and transmission towers to include: 14 (1) the feasibility of requiring the installation of concrete, steel, 15 or fiberglass-reinforced composite electric distribution poles; 16 (2) the feasibility of requiring the installation of higher classes 17 of wood electric distribution utility poles than are currently in use; 18 (3) the feasibility of installing higher class or grades of 19 transmission towers than are currently in use; 20 (4) the feasibility of establishing increased height requirements 21 for electric distribution utility poles which support transformers and 22 related distribution infrastructure; and 23 (5) the implementation of standards related to foundation 24 design, embedment depth, and advanced engineering methods for 25 utility pole installation. 26 The purpose of the study is to determine what type of electric 27 distribution utility poles and transmission towers should be 28 installed, and under what method the installation should occur, to 29 adequately support overhead distribution and transmission 30 infrastructure during a severe weather event including, but not 31 limited to, a hurricane, cyclone, flood, tornado, snow storm, or ice 32 storm. 33 b. In conducting the study, the board shall: 34 (1) consult with relevant persons and public and private entities 35 in other states that have utilized the types of utility poles, 36 transmission towers, or standards described in subsection a. of this 37 section; 38 (2) consider the requirements of the National Electrical Code, 39 the National Electrical Safety Code, the American National 40 Standards Institute, and other applicable national and international 41 standards; and 42 (3) consider the cost to ratepayers, municipalities, electric 43 public utilities, and the State associated with the implementation of 44 the requirements described in subsection a. of this section. 45 c. For the purposes of P.L. , c. (C. ) (pending before 46 the Legislature as this bill), “electric public utility" means a public 47 S1119 MCKEON 3 utility, as that term is defined in R.S.48:2-13, that transmits and 1 distributes electricity to end users within this State. 2 3 2. This act shall take effect immediately. 4 5 6 STATEMENT 7 8 This bill directs the Board of Public Utilities (BPU) to study and 9 prepare and submit, within six months of the effective date of the 10 bill, to the Governor and to the Legislature, a written report making 11 findings and recommendations concerning the feasibility of 12 establishing requirements concerning the installation of new or 13 replacement electric distribution utility poles. The BPU would 14 consider: 1) the feasibility of requiring the installation of concrete, 15 steel, or fiberglass-reinforced composite electric distribution poles; 16 2) the feasibility of requiring the installation of higher classes of 17 wood electric distribution utility poles than are currently in use; 3) 18 the feasibility of installing higher class or grades of transmission 19 towers than are currently in use; 4) the feasibility of establishing 20 increased height requirements for electric distribution utility poles 21 which support transformers and related distribution infrastructure; 22 and 5) the implementation of standards related to foundation design, 23 embedment depth, and advanced engineering methods for utility 24 pole installation. 25 In conducting the study, the board is directed to: 1) consult with 26 relevant persons and public and private entities in other states that 27 have utilized the types of utility poles, transmission towers, or other 28 standards described in the bill; 2) consider the requirements of the 29 National Electrical Code, the National Electrical Safety Code, the 30 American National Standards Institute, and other applicable 31 national and international standards; and
View New Jersey S 1119 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.