Missouri HB 1752: Requires approval by the general assembly before the construction of certain electrical transmission lines
Status: Referred: General Laws(H) (as of 2024-05-17)
State: Missouri · Session: 2024 · Bill: HB 1752
Subjects: ENERGY, GENERAL ASSEMBLY, UTILITIES
Sponsors: Brad Pollitt
Bill Text
SECOND REGULAR SESSION HOUSE BILL NO. 1752 102ND GENERAL ASSEMBLY INTRODUCED BY REPRESENTATIVE POLLITT. 4431H.01I DANA RADEMAN MILLER, Chief Clerk AN ACT To repeal section 393.170, RSMo, and to enact in lieu thereof one new section relating to construction of certain electrical transmission lines. Be it enacted by the General Assembly of the state of Missouri, as follows: Section A. Section 393.170, RSMo, is repealed and one new section enacted in lieu 2 thereof, to be known as section 393.170, to read as follows: 393.170. 1. No gas corporation, electrical corporation, water corporation or sewer 2 corporation shall begin construction of a gas plant, electric plant, water system or sewer 3 system, other than an energy generation unit that has a capacity of one megawatt or less, 4 without first having obtained the permission and approval of the commission. No electrical 5 corporation shall begin construction of any electrical transmission line capable of 6 transmission of electricity in excess of two hundred thirty kilovolts, or any structure 7 containing lines that are capable of transmission of electricity in excess of two hundred 8 thirty total kilovolts where the voltage of all lines on such structure are added together, 9 without having firstobtained specificstatutory authorization fromthe generalassembly 10 and then having obtained the permission and approval of the commission. 11 2. No such corporation shall exercise any right or privilege under any franchise 12 hereafter granted, or under any franchise heretofore granted but not heretofore actually 13 exercised,ortheexerciseofwhichshallhavebeensuspendedformorethanoneyear,without 14 first having obtained the permission and approval of the commission. Before such certificate 15 shallbe issued a certifiedcopy ofthe charter ofsuch corporation shall be filed inthe office of 16 the commission, together with a verified statement of the president and secretary of the EXPLANATION — Matter enclosed in bold-faced brackets [thus] in the above bill is not enacted and is intended to be omitted from the law. Matter in bold-face type in the above bill is proposed language. 17 corporation, showing that it has received the required consent of the proper municipal 18 authorities. 19 3. The commission shall have the power to grant the permission and approval herein 20 specifiedwheneveritshallafterduehearingdeterminethatsuchconstructionorsuchexercise 21 of the right, privilege or franchise is necessary or convenient for the public service. The 22 commission may by its order impose such condition or conditions as it may deem reasonable 23 andnecessary. Unlessexercisedwithinaperiodoftwoyearsfromthegrantthereof,authority 24 conferred by such certificate of convenience and necessity issued by the commission shall be 25 null and void. ✔ HB 1752 2
View Missouri HB 1752 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.