North Carolina SB 428: IBT Reforms.
Status: Passed 1st Reading (as of 2025-03-25)
State: North Carolina · Session: 2025 · Bill: SB 428
Subjects: COMMISSIONS; ENVIRONMENT; ENVIRONMENTAL MANAGEMENT COMN.; LAKES & RIVERS; PUBLIC; WATER RESOURCES
Sponsors: Daniel, Moffitt, B. Newton, Barnes, Brinson, Galey, Hise, Hollo, McInnis, Sawrey, Settle
Bill Text
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 S 1 SENATE BILL 428 Short Title: IBT Reforms. (Public) Sponsors: Senators Daniel, Moffitt, and Hollo (Primary Sponsors). Referred to: Rules and Operations of the Senate March 25, 2025 *S428-v-1* A BILL TO BE ENTITLED 1 AN ACT TO REVISE THE LAWS GOVERNING TRANSFERS OF SURFACE WATER 2 BETWEEN RIVER BASINS. 3 The General Assembly of North Carolina enacts: 4 SECTION 1.(a) Subdivisions (1a) and (1b) of G.S. 143-215.22G are recodified as 5 subdivisions (1b) and (1c), respectively, of that section. 6 SECTION 1.(b) G.S. 143-215.22G, as recodified by subsection (a) of this section, 7 reads as rewritten: 8 "§ 143-215.22G. Definitions. 9 In addition to the definitions set forth in G.S. 143-212 and G.S. 143-213, the following 10 definitions apply to this Part. 11 (1) "Mainstem" means that Mainstem. – That portion of a river having the same 12 name as a river basin defined in subdivision (1b) (1c) of this section. 13 "Mainstem" does not include named or unnamed tributaries. 14 (1a) Major transfer. – A new transfer between river basins greater than 30,000,000 15 gallons per day, or a modification to an existing transfer that would increase 16 the existing transfer more than 30,000,000 gallons per day. 17 (1b) "Public water system" means any Public water system. – Any unit of local 18 government or large community water system subject to the requirements of 19 G.S. 143-355(l). 20 (1c) "River basin" means any River basin. – Any of the following river basins 21 designated on the map entitled "Major River Basins and Sub-basins in North 22 Carolina" and filed in the Office of the Secretary of State on 16 April 1991. 23 The term "river basin" includes any portion of the river basin that extends into 24 another state. Any area outside North Carolina that is not included in one of 25 the river basins listed in this subdivision comprises a separate river basin. 26 ... 27 (2) "Surface water" means any Surface water. – Any of the waters of the State 28 located on the land surface that are not derived by pumping from groundwater. 29 (3) "Transfer" means the Transfer. – The withdrawal, diversion, or pumping of 30 surface water from one river basin and discharge of all or any part of the water 31 in a river basin different from the origin. However, notwithstanding the basin 32 definitions in G.S. 143-215.22G(1b), the following are not transfers under this 33 Part: 34 a. The discharge of water upstream from the point where it is withdrawn. 35 General Assembly Of North Carolina Session 2025 Page 2 Senate Bill 428-First Edition b. The discharge of water downstream from the point where it is 1 withdrawn." 2 SECTION 2. G.S. 143-215.22L reads as rewritten: 3 "§ 143-215.22L. Regulation of surface water transfers. 4 (a) Certificate Required. – No person, without first obtaining a certificate from the 5 Commission, may: 6 (1) Initiate a transfer of 2,000,000 gallons of water or more per day, calculated as 7 a daily average of a calendar month and not to exceed 3,000,000 gallons per 8 day in any one day, from one river basin to another. 9 (2) Increase the amount of an existing transfer of water from one river basin to 10 another by twenty-five percent (25%) or more above the average daily amount 11 transferred during the year ending 1 July 1993 if the total transfer including 12 the increase is 2,000,000 gallons or more per day. 13 (3) Increase an existing transfer of water from one river basin to another above 14 the amount approved by the Commission in a certificate issued under 15 G.S. 162A-7 prior to 1 July 1993. 16 (b) Exception. – Notwithstanding the provisions of subsection (a) of this section, a 17 certificate shall not be required to transfer water from one river basin to another up to the full 18 capacity of a facility to transfer water from one basin to another if the facility was in existence 19 or under construction on 1 July 1993. 20 (c) Notice of Intent to File a Petition. – An applicant shall prepare a notice of intent to 21 file a petition that includes a nontechnical description of the applicant's request and request, an 22 identification of the proposed water source. source, and a preliminary description of alternatives 23 to the transfer considered by the applicant that includes an estimate of the costs of those 24 alternatives. 25 (c1) Hearing and Public Notice on Notice of Intent and Scope. – Within 90 days after the 26 applicant files a notice of intent to file a petition, the applicant Commission shall hold at least 27 two public hearings at the applicant's expense at which the applicant shall provide information 28 to interested parties and the public regarding the nature and size of the proposed transfer, and the 29 Commission shall receive public comment on the scope of the environmental documents. The 30 Commission shall also hold at least one public meeting of these public meetings in the source 31 river basin upstream from the proposed point of withdrawal, withdrawa
View North Carolina SB 428 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.