Connecticut SB 421: AN ACT ESTABLISHING SENIOR SAFETY ZONES.
Status: REF. TO JOINT COMM. ON Aging (as of 2021-01-27)
State: Connecticut · Session: 2021 · Bill: SB 421
Subjects: Elderly centers, Sex offenders
Sponsors: Osten, Catherine A.
Bill Text
LCO 1 of 5 General Assembly Substitute Bill No. 421 February Session, 2026 AN ACT CONCERNING REPORTING OF DOUBLE UTILITY POLES. Be it enacted by the Senate and House of Representatives in General Assembly convened: Section 1. (NEW) (Effective October 1, 2026) (a) As used in this section 1 and section 2 of this act: 2 (1) "Public utility pole" means a pole, including a portion of a pole, 3 owned by a telephone company or an electric distribution company that 4 is used to support wires for (A) the distribution of electricity, (B) 5 telecommunications services, as defined in section 16-247a of the 6 general statutes, or (C) the lighting of streets or sidewalks; 7 (2) "Double utility poles" means a replacement public utility pole 8 built or installed alongside, or attached to, an existing public utility pole, 9 or a portion of an existing public utility pole, for the purpose of 10 transferring the wires from the existing utility pole to the replacement 11 utility pole, provided the existing public utility pole, including any 12 portion of such utility pole, has not been removed after the installation 13 of the replacement utility pole; 14 (3) "Electric distribution company" has the same meaning as 15 provided in section 16-1 of the general statutes; 16 (4) "Telephone company" has the same meaning as provided in 17 Substitute Bill No. 421 LCO 2 of 5 section 16-1 of the general statutes; and 18 (5) "User" means any person or entity, except for an electric 19 distribution company, a telephone company, a municipality or a 20 political subdivision of a municipality, that maintains equipment of any 21 sort on a public utility pole. 22 (b) The owner of any public utility pole, or the owner's agent, shall 23 deliver written notice of any removal and replacement work concerning 24 such utility pole to each user of such utility pole not less than seventy-25 two hours (1) before the starting date of any such work if such work is 26 planned, or (2) after such work is completed if such work was 27 unplanned and necessary to correct a hazardous condition on an 28 emergency basis. Such notice shall describe the location of the public 29 utility pole, the nature of the work completed or to be completed, the 30 date upon which such work was completed or is to be completed and 31 the date and method of delivery of such notice. 32 (c) Each user of a public utility pole that receives notice of work 33 pursuant to subsection (b) of this section shall transfer its equipment 34 from the existing public utility pole to the replacement public utility 35 pole not later than fifteen days after receiving such notice. Upon the 36 completion of the work to transfer equipment pursuant to this 37 subsection, the user shall provide written notice to the owner of such 38 utility pole that such work has been completed. 39 (d) If a user fails to complete the work required to transfer the user's 40 equipment in the time required under subsection (c) of this section, the 41 owner of the public utility pole, or the owner's agent, may complete 42 such work on the user's behalf. Such owner or owner's agent may 43 submit a bill to such user based on the prevailing rate of wages 44 established pursuant to section 31-53 of the general statutes for any such 45 work completed on behalf of such user. 46 (e) (1) Except as provided in subdivision (2) of this subsection, a user 47 that fails to transfer the user's equipment to a replacement public utility 48 pole in compliance with subsection (c) of this section shall be in violation 49 Substitute Bill No. 421 LCO 3 of 5 of this section. The Public Utilities Regulatory Authority may impose, 50 by order of the authority, a civil penalty not to exceed one hundred 51 dollars for each violation of subsection (c) of this section, and in the case 52 of a continued violation, each day thereof shall be deemed a separate 53 violation. The authority shall impose any such civil penalty in 54 accordance with the procedure established in section 16-41 of the 55 general statutes. 56 (2) The authority shall impose no penalty on a user pursuant to this 57 subsection if (A) the user of a public utility pole was prevented from 58 completing the transfer of such user's equipment due solely to a 59 municipality's failure to timely remove or transfer any equipment 60 owned by such municipality or a political subdivision of the 61 municipality, or (B) the owner of a public utility pole, or the owner's 62 agent, completes any work required to transfer such user's equipment 63 pursuant to subsection (d) of this section. 64 (f) (1) An electric distribution company or telephone company that 65 removes a public utility pole, including any portion of such a utility 66 pole, and installs a replacement public utility pole shall complete the 67 transfer of any wires or equipment owned by the electric distribution 68 company or telephone company and the removal of the public utility 69 pole that was replaced not later than fifteen d
View Connecticut SB 421 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.