North Carolina SB 665: Upland Basin Permitting Reform.
Status: Passed 1st Reading (as of 2025-03-26)
State: North Carolina · Session: 2025 · Bill: SB 665
Subjects: CAMA; COASTAL RESOURCES; COASTAL RESOURCES COMN.; COMMERCE; COMMISSIONS; DEQ; ENVIRONMENT; INFRASTRUCTURE; LICENSES & PERMITS; PORTS & HARBORS; PUBLIC; TRANSPORTATION; WATER RESOURCES
Sponsors: Hanig, Sanderson
Bill Text
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 S 1 SENATE BILL 665 Short Title: Upland Basin Permitting Reform. (Public) Sponsors: Senators Hanig and Sanderson (Primary Sponsors). Referred to: Rules and Operations of the Senate March 26, 2025 *S665-v-1* A BILL TO BE ENTITLED 1 AN ACT TO REFORM PERMITTING RELATED TO UPLAND BASINS. 2 The General Assembly of North Carolina enacts: 3 SECTION 1. Article 7 of Chapter 113A of the General Statutes is amended by 4 adding a new Part to read: 5 "Part 5A. Upland Basins. 6 "§ 113A-129.10. Legislative findings; broad construction. 7 (a) The General Assembly finds that development of properly sited and planned upland 8 basins to accommodate vessels is preferable to open-water marinas for a number of reasons, 9 including all of the following: 10 (1) Increasing riparian property owner access to the State's public trust waters. 11 (2) Expanding the total area of the State's public trust waters. 12 (3) Reducing and confining potential storm debris. 13 (4) Reducing the need for additional onshore impervious surfaces associated with 14 parking. 15 (5) Promoting the use of innovative technologies. 16 (6) Promoting the collection of site-specific data designed to assure compliance 17 with applicable water quality standards. 18 (7) Maintaining or improving overall water quality when sited, designed, 19 constructed, and operated in conformance with the provisions of this Part. 20 (b) Accordingly, it is the intent of the General Assembly that this Part be broadly 21 construed to further the general purposes stated in this Part. 22 "§ 113A-129.11. Definitions. 23 As used in this Part, the following definitions apply: 24 (1) AEC or Area of Environmental Concern. – An area designated by the Coastal 25 Resources Commission pursuant to G.S. 113A-113. 26 (2) Boat slip. – Any structure adjoining, attached to, or part of a pier which has 27 the capacity to store one boat. 28 (3) Upland basin. – A marina constructed by excavating or dredging lands of 29 elevations above the current mean or ordinary high-water mark and designed 30 to accommodate more than ten vessels or boat slips. Upland basins shall be 31 considered a water dependent use for purposes of general use standards adopted 32 by the Coastal Resources Commission. 33 "§ 113A-129.12. Upland basin permitting and development. 34 (a) Unless the Director of the Division of Water Resources makes a finding, based on 35 site-specific technical information, that the applicant cannot substantially comply with one or 36 General Assembly Of North Carolina Session 2025 Page 2 Senate Bill 665-First Edition more of the criteria listed in subsection (b) of this section, the Division of Water Resources and 1 the Division of Coastal Management shall approve an application for the development of an 2 upland basin project, within 60 days after the applicant submits a completed application or 3 supplemental information requested by the Department to demonstrate substantial compliance 4 with all of the criteria set forth in subsection (b) of this section. The Department may make one 5 written request for any supplemental information necessary to make its finding within 30 days after 6 the applicant submits a complete application, and the permit may be conditioned upon measures 7 that are materially necessary to ensure that the applicant complies with all the criteria set forth in 8 subsection (b) of this section. When the Department requests supplemental information, the 60-day 9 review period restarts upon receipt of the supplemental information requested by the Department. 10 If the Department fails to act on an application for the development of an upland basin project 11 within the 60-day review period, the application shall be deemed approved. 12 (b) The criteria with which an upland basin shall comply to qualify for permitting pursuant 13 to subsection (a) of this section are all of the following: 14 (1) The upland basin is designed to accommodate ten or more vessels, including 15 individual homeowner boat slips, boat lifts, or dry stack storage. 16 (2) The waters contained in the upland basin have a dissolved oxygen content 17 equal to or greater than the dissolved oxygen content of the water located 50 18 feet plus or minus 5 feet from the entrance to the upland basin before 19 development. As part of the application, an applicant shall provide to the 20 Division of Water Resources and the Division of Coastal Management 21 site-specific sampling data documenting pre-project dissolved oxygen levels 22 of the water located 50 feet plus or minus 5 feet from each proposed entrance 23 to the proposed upland basin. Waters located within the upland basin shall be 24 classified the same as the waters in the immediate vicinity of any entrance to 25 the upland basin. 26 (3) The project has a bond or set-aside funds for the long-term operation and 27 maintenance of any technology required to meet or exceed then-applicable 28 water quality standards. The
View North Carolina SB 665 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.