Iowa HF 2668: A bill for an act relating to the regulation of public utilities, including virtual power plants and integrated resource planning.
Status: Introduced, placed on calendar. (as of 2026-02-23)
State: Iowa · Session: 2025-2026 · Bill: HF 2668
Subjects: utilities
Sponsors: COMMITTEE ON COMMERCE
Bill Text
House File 2668 - Introduced HOUSE FILE 2668 BY COMMITTEE ON COMMERCE (SUCCESSOR TO HF 2365) A BILL FOR An Act relating to the regulation of public utilities, 1 including virtual power plants and integrated resource 2 planning. 3 BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF IOWA: 4 TLSB 6666HV (2) 91 sb/js H.F. 2668 Section 1. Section 476.53, subsection 2, Code 2026, is 1 amended by adding the following new paragraph: 2 NEW PARAGRAPH . c. Customer-owned generation and storage 3 is vital to cost-effectively meeting rising demand for 4 electricity. Virtual power plants are a collection of 5 customer-owned distributed generation resources and energy 6 storage devices managed and dispatched by a common control 7 mechanism, which may only be located in the service territory 8 of a rate-regulated electric utility. Virtual power plants 9 shall not be considered public utilities under this chapter. 10 The commission shall promulgate rules that provide a process 11 and standards for the commission’s approval and oversight of 12 virtual power plants, including information the commission 13 finds necessary for the evaluation of a virtual power plant 14 proposal. Such information shall include the nature of the 15 resources that may participate in a virtual power plant, 16 the entities who may propose virtual power plants, and the 17 estimated benefits to customers in the service territory in 18 which the virtual power plant will operate. The commission 19 shall not approve or continue to allow the operation of a 20 virtual power plant if the virtual power plant does not, under 21 standards established by the commission, benefit the customers 22 in the service territory in which the virtual power plant 23 operates. 24 Sec. 2. NEW SECTION . 476.53B Integrated resource planning. 25 1. To implement the intent of the general assembly as set 26 forth in sections 476.53 and 476.53A, each rate-regulated 27 public utility shall file with the commission an integrated 28 resource plan every five years, with the first plan due 29 July 1, 2028. The commission shall promulgate rules for the 30 development and evaluation of integrated resource plans. At a 31 minimum, the rules shall include all of the following: 32 a. A process under which a utility files a new plan every 33 five years that includes a five-year and a twenty-year planning 34 horizon. 35 -1- LSB 6666HV (2) 91 sb/js 1/ 5 H.F. 2668 b. A quantitative comparative analysis of multiple resource 1 mixes to serve anticipated customer needs using industry best 2 practices, including capacity expansion and production cost 3 modeling that include all of the following for both planning 4 horizons: 5 (1) Existing and potential generating resources needed to 6 serve customers, including competitively procured purchase 7 power agreements and market purchase. 8 (2) The process for determining the forecast projects, 9 costs, and other inputs and assumptions to be used in an 10 integrated resource plan by all parties. It is the intent of 11 the general assembly that the utilities use uniform scenarios, 12 inputs, assumptions, and sources of data. 13 (3) An assessment of customer costs and seasonal 14 reliability. 15 (4) Resources including energy efficiency, demand response, 16 peak load conservation, and distributed generation plans, 17 as described elsewhere in this chapter, that will assist in 18 meeting energy and capacity needs. 19 (5) A utility’s energy and capacity forecasts, for existing 20 and potential generating resources, as described elsewhere 21 in this chapter, including filings made with any federal or 22 regional authority. The forecast shall include but is not 23 limited to a forecast of the requirements of customers, its 24 anticipated sources of supply, and its anticipated means of 25 addressing the forecasted electric generating needs. 26 (6) Transmission and distribution upgrades and expansion 27 plans needed to reliably serve the utility’s customers and 28 integrate each potential resource, and the associated costs 29 of such plans in connection with the various resource mixes 30 proposed. 31 c. Determination of eligibility for access to modeling 32 software and data, including access to appropriate data from 33 the utilities’ production cost model scenarios. The commission 34 may determine the number of parties eligible for access to the 35 -2- LSB 6666HV (2) 91 sb/js 2/ 5 H.F. 2668 modeling software. 1 d. The ability of parties eligible for access to the 2 modeling software license to have at least four alternative 3 scenarios and a process to best balance and represent the input 4 of the respective parties. The alternative scenarios will be 5 included on equal footing with utility scenarios. 6 e. Annual reporting on the performance of the plan and any 7 nonmaterial updates. 8 f. Mechanisms for the utility to make, or for the 9 commission, the office
View Iowa HF 2668 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.