Connecticut HB 5520: AN ACT CONCERNING FISH PASSAGES.
Status: FILE NO. 434 (as of 2026-04-07)
State: Connecticut · Session: 2026 · Bill: HB 5520
Subjects: Dams, Electronic government information, Energy and Environmental Protection, Department of, Fishways, Notices, Permits, Petitions, Public hearings, Reservoirs
Sponsors: Aundre Bumgardner, Mark W. Anderson, Patricia A. Dillon, Mike Demicco, John-michael Parker
Bill Text
LCO 1 of 5 General Assembly Substitute Bill No. 5520 February Session, 2026 AN ACT CONCERNING FISH PASSAGES. Be it enacted by the Senate and House of Representatives in General Assembly convened: Section 1. Section 26-136 of the general statutes is repealed and the 1 following is substituted in lieu thereof (Effective from passage): 2 [(a) Upon petition of ten or more persons owning property above any 3 dam or artificial obstruction existing on October 1, 1982, built upon any 4 stream, the commissioner shall determine whether such dam or artificial 5 obstruction shall be provided by the person, firm, corporation or 6 municipality or political subdivision thereof, owning or controlling the 7 dam or obstruction with a suitable fishway for the passage of fish. Upon 8 receipt of an application for a permit to construct, rebuild or 9 substantially repair a dam or artificial obstruction built upon any 10 stream, the commissioner shall require the dam or artificial obstruction 11 be provided with a fishway if such a facility is necessary to protect 12 fisheries resources by providing access to natural spawning or nursery 13 areas or to protect the public interest by preventing the loss of a fishery 14 from the area of the dam or artificial obstruction. For the purposes of 15 this section, "rebuild" or "substantially repair" means any action altering 16 the structure of the dam or artificial obstruction, changing the use of the 17 dam or artificial obstruction or impeding the available free passage of 18 fish. 19 Substitute Bill No. 5520 LCO 2 of 5 (b) Within thirty days from the receipt of such petition or application, 20 the commissioner shall set a time and place for a hearing thereon, if in 21 the opinion of the commissioner a hearing is reasonable or necessary. 22 (c) Upon determination that a fishway is necessary, the commissioner 23 shall issue an order to the person, firm, corporation or municipality or 24 political subdivision thereof owning or controlling the dam or 25 obstruction to construct a fishway in the form, material, capacity, at such 26 location and within such time as the commissioner establishes. The 27 commissioner shall cause a copy of the order to be served on the person, 28 firm, corporation or municipality or political subdivision thereof. Such 29 fishway shall be constructed and maintained subject to the approval of 30 the commissioner, and shall be kept open and free for the passage of 31 such fish in such manner and during such period as the commissioner 32 requires. If no such period is specified by the commissioner, it shall be 33 kept open and free from April first to November first in each year.] 34 (a) Any person may submit a petition to the Commissioner of Energy 35 and Environmental Protection for a safe, timely and effective fish 36 passage for any hydroelectric dam that is not subject to the jurisdiction 37 of the Federal Energy Regulatory Commission. Upon the submittal of 38 such a petition, the commissioner shall determine whether there is a 39 safe, timely and effective fish passage for migratory fish at all life stages 40 upstream and downstream of such dam and associated reservoir. For 41 purposes of this section, a fish passage is deemed safe, timely and 42 effective if it meets or exceeds the Connecticut River Migratory Fish 43 Restoration Cooperative's fish passage standards developed by the 44 Connecticut River Atlantic Salmon Commission. 45 (b) If the commissioner determines that there is not a safe, timely and 46 effective fish passage, the commissioner shall prescribe, by order, issued 47 to the person, firm, corporation or municipality, or political subdivision 48 thereof, that owns or controls such dam, the conditions to ensure such a 49 safe, timely and effective fish passage both upstream of such reservoir 50 and downstream of such dam. Such conditions may include, but shall 51 not be limited to, requirements to (1) construct, rebuild and operate 52 Substitute Bill No. 5520 LCO 3 of 5 fishways, (2) remove any artificial obstructions, and (3) maintain 53 minimum water flows. If the commissioner determines that any existing 54 fish passage structures are ineffective or harmful to aquatic life, the 55 commissioner shall include conditions to remediate such harm, 56 including, but not limited to, removal or reconstruction of the fish 57 passage structures. 58 (c) Not later than one hundred eighty days after submittal of any such 59 petition, the commissioner shall publish notice of the commissioner's 60 tentative determination as to whether there is a safe, timely and effective 61 fish passage. If the commissioner determines that there is not a safe, 62 timely and effective fish passage, the commissioner shall publish a draft 63 order in the commissioner's notice of tentative determination. Such 64 notice shall be published on the Department of Energy and 65 Environmental Protection's Internet web site. The commissioner shall 66 provide a public comment pe
View Connecticut HB 5520 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.