New Hampshire SB 106: relative to the participation of customer generators in net energy metering.
Status: Indefinitely Postpone (Rep. Vose): MA RC 172-152 01/08/2026 HJ 2 P. 72 (as of 2026-01-08)
State: New Hampshire · Session: 2026 · Bill: SB 106
Sponsors: David H. Watters, Michael I Moffett, Daniel E. Innis, Timothy Lang, Howard Pearl, Tim McGough
Bill Text
SB 106-FN - AS AMENDED BY THE SENATE 02/13/2025 0257s 03/06/2025 0543s 2025 SESSION 25-0476 06/08 SENATE BILL 106-FN AN ACT relative to the participation of customer generators in net energy metering. SPONSORS: Sen. Lang, Dist 2; Sen. Innis, Dist 7; Sen. McGough, Dist 11; Sen. Pearl, Dist 17; Sen. Watters, Dist 4; Rep. Moffett, Merr. 4 COMMITTEE: Energy and Natural Resources ───────────────────────────────────────────────────────────────── AMENDED ANALYSIS This bill requires large customer-generators participating in net energy metering to consume at least 33 percent of their own generation. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Explanation: Matter added to current law appears in bold italics. Matter removed from current law appears [in brackets and struckthrough.] Matter which is either (a) all new or (b) repealed and reenacted appears in regular type. 02/13/2025 0257s 03/06/2025 0543s 25-0476 06/08 STATE OF NEW HAMPSHIRE In the Year of Our Lord Two Thousand Twenty Five AN ACT relative to the participation of customer generators in net energy metering. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 Limited Electrical Energy Producers Act; Definition; Eligible Customer Generator. Amend RSA 362-A:1-a, II-b to read as follows: II-b. "Eligible customer-generator" or "customer-generator" means an electric utility customer who owns, operates, or purchases power from an electrical generating facility either powered by renewable energy or which employs a heat led combined heat and power system, with a total peak generating capacity of up to and including one megawatt, except as provided for a municipal host as defined in paragraph II-c[, that is located behind a retail meter on the customer's premises,] and an industrial host as defined under paragraph II-g, that is located behind a retail meter on the customer's premises, is interconnected and operates in parallel with the electric grid, and is used to offset the customer's own electricity requirements. Incremental generation added to an existing generation facility, that does not itself qualify for net metering, shall qualify if such incremental generation meets the qualifications of this paragraph and is metered separately from the [nonqualifying] non-qualifying facility. 2 New Paragraph; Limited Electrical Energy Producers Act Definitions. Amend RSA 362-A:1-a by inserting after paragraph II-f the following new paragraph: II-g. "Industrial host" means a customer-generator with a total peak generating capacity of greater than one megawatt and less than 5 megawatts, used to offset the electricity requirements of a group consisting exclusively of commercial, industrial, or institutional entities with one or more accounts, provided that all accounts are located within the same utility franchise service territory. If an industrial host’s total annual net exported generation exceeds the total annual electricity usage of the host and members of the group, the industrial host shall be entitled to compensation for that excess generation according to the process established by the department’s 900 rules for annual reconciliation. An industrial host may be owned by either a public or private entity. 3 New Paragraph; Net Energy Metering. Amend RSA 362-A:9 by inserting after paragraph II the following new paragraph: II-a. Alternative tariffs for net energy metering shall be made available to eligible customer-generators by each electric distribution utility in conformance with Order No. 26,029 dated June 23, 2017, and with net metering rules adopted by the commission. Any project that begins receiving compensation under Order No. 26,029 alternative tariffs will be eligible to continue receiving that tariff for either 20 years from the year it first begins receiving compensation or through the initial tariff term ending on December 31, 2040, whichever is longer. If the commission creates new net metering tariffs through an adjudicated proceeding before December 31, 2040, eligible customer-generators receiving Order No. 26,029 alternative tariffs will have the option of transitioning to new tariffs created through that proceeding. If an eligible customer-generator elects to transfer to a new tariff, they may not return to Order No. 26,029 alternative tariffs. Upon the expiration of a customer-generator’s eligibility under Order No. 26,029 alternative tariffs, the eligible customer-generator will have the option of transitioning to the tariff available at that time. 4 New Paragraph; Net Energy Metering; Consumption. Amend RSA 362-A:9 by inserting after paragraph IV the following new paragraph: IV-a.(a) Facilities eligible for the net metering tariff under this section for customer-generators larger than one megawatt and up to 5 megawatt with an in-service date aft
View New Hampshire SB 106 on LegisTrack → — full text, sponsors, votes, campaign finance, and cross-state matches.